PUBLIC LAW 99-000—MMMM. DD, 1986

PUBLIC LAW 99-662—NOV. 17, 1986

100 STAT. 4179

SEC. 850. BAYOU LAFOURCHE, LOUISIANA.

The project for navigation, Bayou Lafourche and Lafourche-Jump Waterway, Louisiana, authorized by the River and Harbor Act of August 30, 1935, is modified to authorize the Secretary to carry out 33 USC 540. planning, engineering, and design for a project for the maintenance by the Secretary of a channel 30 feet deep from mile minus 2 to mile 0 in Belle Pass and of a channel 24 feet deep from mile 0 to mile 4 in Bayou Lafourche. The Secretary is authorized and directed to study the feasibility of deepening the channel from mile 0 to mile 4 in Bayou Lafourche to 30 feet. The Secretary shall report the results of Reports, such study with recommendations to the Committee on Public Works and Transportation of the House of Representatives and the Committee on Environment and Public Works of the Senate. SEC. 851. NOYO, MENDOCINO COUNTY, CALIFORNIA.

(a) The project for harbor improvement at Noyo, Mendocino County, California, authorized by the River and Harbor Act of 1962 (76 Stat. 1173), is modified to provide that the non-Federal interests shall contribute 50 percent of the cost of areas required for initial and subsequent disposal of dredged material, and of necessary retaining dikes, bulkheads, embankments, and movement of materials therefor. (b) If, in lieu of diked disposal, the Secretary determines ocean disposal is necessary to carry out the project, the Federal share of the cost of such ocean disposal shall be 100 percent.

,^

SEC. 852. ENDICOTT, JOHNSON CITY, AND VESTAL, NEW YORK.

Subject to section 903(a), the project for flood control, Endicott, Flood control. Johnson City, and Vestal, New York, authorized by the Flood Control Act of 1954, is modified to authorize the Secretary to 68 Stat. 1256. undertake such measures as may be necessary to correct erosion problems affecting the levee at Vestal, New York, and to perform necessary work to protect the levee and restore it to its design condition, at a total cost of $700,000, with an estimated first Federal cost of $525,000 and an estimated first non-Federal cost of $175,000. The non-Federal share of the cost of such measures and work shall be determined under section 103 of this Act.

>

SEC. 853. CAMBRIDGE CREEK, MARYLAND.

The project for navigation, Cambridge Creek, Maryland, is modified to authorize and direct the Secretary to narrow the channel in the existing project, as determined necessary by the Secretary for the purpose of enhancing economic development in the area of such creek.

^c;

SEC. 854. SANDY HOOK TO BARNEGAT INLET, NEW JERSEY.

(a) Subject to section 903(a) of this Act, the project for beach erosion control, Sandy Hook to Barnegat Inlet, New Jersey, authorized by the River and Harbor Act of 1958, is modified to provide 72 Stat. 297. that the first Federal construction increment of the Ocean Township to Sandy Hook reach of such project shall consist of a berm of approximately 50 feet at Sea Bright and Monmouth Beach extending to and including a feeder beach in the vicinity of Long Branch, at a total cost of $40,000,000, with an estimated first Federal cost of $21,200,000 and an estimated first non-Federal cost of $18,800,000. (b) The non-Federal share of the cost of construction and maintenance of the Ocean Township to Sandy Hook reach of the project for