Page:United States Statutes at Large Volume 100 Part 5.djvu/779

This page needs to be proofread.

PUBLIC LAW 99-000—MMMM. DD, 1986

PUBLIC LAW 99-662—NOV. 17, 1986

100 STAT. 4253

and design for a project for the recharge of groundwater in the drainage basins of the Tucson, Arizona, and Scottsdale, Arizona, metropolitan areas, at a total cost of $250,000. SEC. 1142. MEASUREMENTS OF LAKE MICHIGAN DIVERSIONS.

(a) Beginning October 1, 1987, the Secretary, in cooperation with the State of Illinois, shall carry out measurements and make necessary computations required by the decree of the United States Supreme Court (388 U.S. 426) relating to the diversion of water from Lake Michigan and shall coordinate the results with downstate interests. The measurements and computations shall consist of all flow measurements, gauge records, hydraulic and hydrologic computations, including periodic field investigations and measuring device calibrations, necessary to compute the amount of water diverted from Lake Michigan by the State of Illinois and its municipalities, political subdivisions, agencies, and instrumentalities, not including water diverted or used by Federal installations. (b) There are authorized to be appropriated $250,000 per fiscal year for each fiscal year beginning after September 30, 1986, to carry out this section, including those funds necessary to maintain the measurements and computations, as well as necessary capital construction costs associated with the installation of new flow measurement devices or structures declared necessary and appropriate by the Secretary.

42 USC 1962d-20 note.

Appropriation authorization.

SEC. 1143. BERKELEY PIER, CALIFORNIA.

The Secretary is authorized to carry out planning, engineering, and design for a project to remove the Berkeley Pier, which extends into San Francisco Bay, California, approximately 12,000 feet, at a total cost of $200,000. SEC. 1144. CONSTRUCTION OF SEAWALL, AMERICAN SAMOA.

The Secretary is authorized to carry out planning, engineering, and design for a project to construct a seawall from the canneries in the village of Atu'u, Ma'oputasi County, to Breakers Point near the village of Tafananai, Sua County, Western Tutuila Island, American Samoa, at a total cost of $310,000. SEC. 1145. REHABILITATION OF DOCK, AMERICAN SAMOA.

Subject to section 903(a) of this Act, the Secretary is authorized to rehabilitate the fuel dock adjacent to the Rainmaker Hotel between the villages of Utulei and Fagatogo in Ma'oputasi County, Eastern Tutuila Island, American Samoa, at a total cost of $3,000,000, with an estimated first Federal cost of $3,000,000. SEC. 1146. ACCEPTANCE OF CERTAIN FUNDS FOR MITIGATION.

The Secretary is authorized to accept funds from any entity, public or private, in accordance with the Pacific Northwest Electric Power Planning and Conservation Act to be used to protect, mitigate, and enhance fish and wildlife in connection with projects constructed or operated by the Secretary. The Secretary may accept and use funds for such purposes without regard to any limitation established under any other provision of law or rule of law. SEC. 1147. GREAT LAKES CONSUMPTIVE USES STUDY.

(a) STUDY OF CONSUMPTIVE USES.—In recognition of the serious

impacts on the Great Lakes environment that may occur as a result of increased consumption of Great Lakes water, including loss of

33 USC 2286. Fish and fishing. Wildlife.

42 USC 1962d-20 note.