Page:United States Statutes at Large Volume 106 Part 6.djvu/261

This page needs to be proofread.

PUBLIC LAW 102-580—OCT. 31, 1992 106 STAT. 4819 (i) BROCKTON, MASSACHUSETTS.— (1) IN GENERAL. — The Secretary, in consultation with the Administrator of the Environmental Protection Agency, shall conduct a study of— (A) the water supplv, distribution, and transmission needs of the city of Brockton, Massachusetts, for the purpose of developing recommendations for Federal participation in meeting such needs; (B) the economic, engineering, and environmental feasibility of providing additional water supply for Brockton, Massachusetts, and vicinity in the Taunton River Basin with a view toward providing for future regional increase in mimicipal and industrial water demands; and (C) the water quality and quantity and related land resources of the Taunton River for the purpose of developing a detailed survey and evaluation of existing and future uses of the resources. (2) REPORT. —Not later than 1 year after the date of the enactment of this Act, the Secretary shall transmit to Congress a report on the results of the study conducted under paragraph (1). The report must include, at a minimum, a recommendation for the best location of a reservoir for water supply storage on the Taimton River as well as a treatment plant and a recommendation for a route for piping the water from the treatment plant to Brown's Crossing and to Brockton. (j) HAVERHILL, MASSACHUSETTS.— (1) STUDY.—The Secretary shall conduct a study on proposed uses of the seawall located in Haverhill, Massachusetts. (2) REPORT. —Not later than 2 years after the date of the enactment of this Act, the Secretary shall transmit to Congress a report on the results of the study conducted under this subsection. (k) GRAND MARAIS HARBOR, MICHIGAN.— Not later than 18 months after the date of the enactment of this Act, the Secretary shall conduct an economic reevaluation of proposed improvements at Grand Marais Harbor, Michigan. (1) YAZOO BASIN, MISSISSIPPI.— (1) REVIEW AND EVALUATION.—The Secretary shall conduct a review and evaluation of the recreational master plan for Yazoo Basin, Mississippi. (2) PURPOSE. —The purpose of the review and evaluation to be conducted under paragraph (1) is to develop recommendations for Federal and non-Federal participation in the master pl£m referred to in paragraph (1). (3) REPORT. — Not later than 1 year after the date of the enactment of this Act, the Secretary shall transmit to the Committee on Public Works and Transportotion of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on the resulte of the review and evaluation to be conducted under this subsection, (m) RAMAPO RIVER AT OAKLAND, NEW JERSEY. —The Secretary shall conduct a study of the project for flood control, Ramapo River, Oakland, New Jersey, authorized by section 401(a) of the Water Resources Development Act of 1986 (100 Stet. 4120), for the purpose of determining the feasibility of modifying the project to include realignment of the Ramapo River channel modification through Potash Lake, replacement of the Pompton lake Dam has-