Page:United States Statutes at Large Volume 118.djvu/2334

This page needs to be proofread.

118 STAT. 2304 PUBLIC LAW 108–410—OCT. 30, 2004 LEGISLATIVE HISTORY—H.R. 5294: CONGRESSIONAL RECORD, Vol. 150 (2004): Oct. 8, considered and passed House. Oct. 11, considered and passed Senate. and the Chairman of the Board. The Project Director shall report directly to the Project Team.’’. (b) RESPONSIBILITIES OF THE BOARD.— (1) IN GENERAL.—Section 12(c)(1) of such Act (20 U.S.C. 76q–1(c)(1)) is amended by inserting ‘‘, in consultation with the Project Team,’’ after ‘‘The Board’’. (2) CONSTRUCTION OF BUILDINGS.—Section 12(c)(3) of such Act (20 U.S.C. 76q–1(c)(3)) is amended by inserting ‘‘, in con sultation with the Project Team,’’ after ‘‘The Board’’. (3) APPROVAL BY PROJECT TEAM.—Section 12(c) of such Act (20 U.S.C. 76q–1(c)) is amended by adding at the end the following: ‘‘(5) APPROVAL BY PROJECT TEAM.—Notwithstanding section 5(e), any decision by the Board that will significantly affect, as determined by the Project Team in consultation with the Board, the scope, cost, schedule, or engineering feasibility of any element of the Project, other than buildings to be con structed on the Plaza, shall be subject to the approval of the Project Team.’’. (c) GAO REVIEW.—Section 12 of such Act (20 U.S.C. 76q– 1) is amended by adding at the end the following: ‘‘(g) GAO REVIEW.—Until completion of the Project, the Comp troller General shall review the management and oversight of construction of the Project by the Board and report periodically on the results of the review to the Committee on Transportation and Infrastructure of the House of Representatives and the Com mittee on Environment and Public Works of the Senate.’’. Approved October 30, 2004. Reports.