Page:United States Statutes at Large Volume 118.djvu/3571

This page needs to be proofread.

118 STAT. 3541 PUBLIC LAW 108–451—DEC. 10, 2004 ‘‘(54) 1982 ACT.—The term ‘1982 Act’ means the Southern Arizona Water Rights Settlement Act of 1982 (96 Stat. 1274; 106 Stat. 3256), as in effect on the day before the enforceability date. ‘‘SEC. 304. WATER DELIVERY AND CONSTRUCTION OBLIGATIONS. ‘‘(a) WATER DELIVERY.—The Secretary shall deliver annually from the main project works of the Central Arizona Project, a total of 37,800 acre-feet of water suitable for agricultural use, of which— ‘‘(1) 27,000 acre-feet shall— ‘‘(A) be deliverable for use to the San Xavier Reserva- tion; or ‘‘(B) otherwise be used in accordance with section 309; and ‘‘(2) 10,800 acre-feet shall— ‘‘(A) be deliverable for use to the eastern Schuk Toak District; or ‘‘(B) otherwise be used in accordance with section 309. ‘‘(b) DELIVERY AND DISTRIBUTION SYSTEMS.—The Secretary shall (without cost to the Nation, any allottee, the San Xavier Cooperative Association, or the San Xavier Allottees Association), as part of the main project works of the Central Arizona Project, design, construct, operate, maintain, and replace the delivery and distribution systems necessary to deliver the water described in subsection (a). ‘‘(c) DUTIES OF THE SECRETARY.— ‘‘(1) COMPLETION OF DELIVERY AND DISTRIBUTION SYSTEM AND IMPROVEMENT TO EXISTING IRRIGATION SYSTEM.—Except as provided in subsection (d), not later than 8 years after the enforceability date, the Secretary shall complete the design and construction of improvements to the irrigation system that serves the cooperative farm. ‘‘(2) EXTENSION OF EXISTING IRRIGATION SYSTEM WITHIN THE SAN XAVIER RESERVATION.— ‘‘(A) IN GENERAL.—Except as provided in subsection (d), not later than 8 years after the enforceability date, in addition to the improvements described in paragraph (1), the Secretary shall complete the design and construc- tion of the extension of the irrigation system for the cooperative farm. ‘‘(B) CAPACITY.—On completion of the extension, the extended cooperative farm irrigation system shall serve 2,300 net irrigable acres on the San Xavier Reservation, unless the Secretary and the San Xavier Cooperative Association agree on fewer net irrigable acres. ‘‘(3) CONSTRUCTION OF NEW FARM.— ‘‘(A) IN GENERAL.—Except as provided in subsection (d), not later than 8 years after the enforceability date, the Secretary shall— ‘‘(i) design and construct within the San Xavier Reservation such additional canals, laterals, farm ditches, and irrigation works as are necessary for the efficient distribution for agricultural purposes of that portion of the 27,000 acre-feet annually of water described in subsection (a)(1) that is not required for Deadlines. VerDate 11-MAY-2000 13:54 Nov 10, 2005 Jkt 029194 PO 00000 Frm 00075 Fmt 6580 Sfmt 6581 C:\STATUTES\2004\29194PT4.001 APPS10 PsN: 29194PT4