Page:United States Statutes at Large Volume 119.djvu/1286

This page needs to be proofread.

[119 STAT. 1268]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1268]

119 STAT. 1268

PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued

No. 295 296

297 298 299 300 301 302 303 304 305

306 307 308 309 310 311 312 313 314 315 316

317

318

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Jkt 039194

PO 00002

State

Project Description

IL

For IDOT to conduct Phase II engineering for reconstruction of 159th St./US 6/IL 7 in Will and Cook Counties .......................................... For Will County to begin Phase II engineering and preconstruction activities for a high level bridge linking Caton Farm Road with Bruce Road ....................................................... Study of Thomas Bridge to meet future cargo and passenger traffic needs of the ports of Long Beach and Los Angeles ......................... Construct new Greenbelt Metro Station Access Interchange at I–95/I–495 .............................. Construct Citywide bicycle path network, City of Evanston ...................................................... Mount Vernon Avenue grade separation and bridge expansion in Colton ............................. Improvements for St. Georges Avenue from Wood Avenue to Chestnut Street including the Linden and Roselle sides of the street .... Design, construct and upgrade interchange of U.S. 15 and U.S. 30 in Adams County .......... State Route 8 Improvements in Northern Summit County ............................................... U.S. 50 East, State Line to Pueblo .................... Widening road (along Gordon Road, Sixth Street, and West Shafer Drive) to 3-lane street, with sidewalk and improvements to existing bridge White County/Monticello, Indiana ................................................................. Widening Pleasant Valley Bagley Road (Rte 27), Parma and Middleburg Heights ............. Rehabilitation of I–95 Whittier Bridge— Amesbury and Newburyport .......................... Streetscape improvements at East 14th StMission Blvd. in Alameda County ................. Construct W. 79th St. Rotunda, New York City ................................................................... Acquire Kelly Parkway Corridor Right-of-way through San Antonio ....................................... Construct new route from U.S. 17 to U.S. 421 in Brunswick and New Hanover Counties .... Construct safety and capacity improvements to Route 309 and Old Packhouse Road ......... Delta Ponds Bike/Pedestrian Path .................... Hollywood U.S. Route 1 Young Circle Safety Improvement .................................................... Houghton County, Gravel and paving of remaining 3.2 miles in 5.5 mile stretch of Jacobsville Rd .................................................. Improve access to Airport Connector from PA 283 to the terminus of the Airport Connector at State Route 230 and adjacent access roads ................................................................. Construct one additional all purpose lane in each direction on I–405 and provide additional capital improvements from SR 73 through the LA County line ........................... Improve Roads and Bridges, Cook County .......

IL

CA MD IL CA NJ PA OH CO IN

OH MA CA NY TX NC PA OR FL MI PA

CA

IL

Frm 00125

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

Amount

APPS06

$800,000

$1,600,000 $1,600,000 $1,000,000 $200,000 $1,600,000 $400,000 $3,200,000 $3,000,000 $6,000,000

$11,520,000 $1,200,000 $1,600,000 $600,000 $1,600,000 $400,000 $800,000 $200,000 $2,880,000 $1,840,000 $344,000

$800,000

$2,568,000 $3,200,000

PsN: PUBL002