Page:United States Statutes at Large Volume 119.djvu/1294

This page needs to be proofread.

[119 STAT. 1276]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1276]

119 STAT. 1276

PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued

No. 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Jkt 039194

PO 00002

State

Project Description

LA

Upgrade highway-rail crossings at Madison Street, City of Gretna ..................................... Two-lane Extension of Bristol Road, Bucks County .............................................................. Widen SR 30 From Athens to Etowah, Tennessee ............................................................... Iosco County, Reconstruct Bissonette Road from Lorenz Road to Chambers Road ............ Development of one-story 300-vehicle parking facility ............................................................... Design and construct improved I–182 interchange ramps at Broadmoor Blvd. in Pasco, WA .................................................................... Erie Canalway National Heritage Corridor in Lockport, NY—Transportation Enhancements ................................................................ M–6 Paul Henry Freeway trail design and construction ..................................................... Reconstruction and conversion of Union Station in North Canaan to establish a transportation museum ........................................... Construct passing lanes on U.S. 199, Josephine County ................................................... Scenic preservation and run-off mitigation in the Santa Monica Mountains National Recreation Area near PCH and U.S. 101 ...... South Shore Drive and 67th Underpass ........... Mission Boulevard/State Route 71 Interchange—Corridor Improvements ................... For purchase of right-of-way, planning, design, and construction of a highway, Newberg ...... Smith River Trail—Construction of trail along Smith River in Henry County ........................ Resurface Clifton Park Ave. and S. Louis Ave., Village of Evergreen ........................................ University Heights Connector for improvements to First Street in Newark from Sussex Street to West Market Street .................. Broad Avenue Bridge: Albany ........................... Carlsbad, CA Construction of Poinsettia Lane Construct pedestrian enhancements on Broadway in Los Angeles ......................................... Construct Rt. 56 Maurice River Bridge Replacement, Salem and Cumberland Counties Conduct route analysis for community pathway through Chehalis ..................................... Construct a multi-jurisdictional non-motorized transportation project parallel to SR 99 called the Interurban Trail ............................. Construct Downtown Bypass Roadway Connector, Lake Mary, Florida ............................. To study, design, and construct the Brooklyn Waterfront Greenway in Red Hook, Greenpoint, and the Navy Yard in Brooklyn Update all county and town traffic signage in Wayne County, NY .......................................... Construct Route 101 Auxiliary Lanes 3rd Ave. in the City of San Mateo to Millbrae Ave. in Millbrae ............................................................

PA TN MI TX WA NY MI CT OR CA IL CA OR VA IL NJ GA CA CA NJ WA WA FL NY NY CA

Frm 00133

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

Amount

APPS06

$160,000 $1,600,000 $4,606,400 $258,000 $1,200,000 $1,600,000 $2,600,000 $2,224,000 $1,364,000 $1,827,000 $1,200,000 $1,040,000 $3,360,000 $8,545,600 $400,000 $320,000 $509,600 $400,000 $1,600,000 $2,000,000 $1,600,000 $50,000 $1,600,000 $400,000 $6,600,000 $220,000 $3,000,000

PsN: PUBL002