Page:United States Statutes at Large Volume 119.djvu/1298

This page needs to be proofread.

[119 STAT. 1280]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1280]

119 STAT. 1280

PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued

No. 605 606

607

608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625

626

627

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Jkt 039194

PO 00002

State

Project Description

TX

Bridge Access Road for FM 493 from U.S. 281 to U.S. 83 ......................................................... Pinal Avenue/Main Street right-of-way acquisition—Pinal County, Casa Grande, AZ—To reconstruct Main St. to include a bypass for commercial traffic ............................................ Design, engineering, ROW acquisition, and construction of streetscaping enhancements, paving, lighting, safety improvements, parking, garage, and roadway redesign in Duryea Borough, Luzerne County ................. SH-33, Widen SH 33 from the Cimarron River East to U.S. 177 Payne County, OK .............. Washington Boulevard Improvements in Beaumont, Texas ..................................................... Widen Midway Road from South 25th Street to U.S. 1 in St. Lucie County ......................... Enhance road and transportation facilities in the vicinity of W. 65th St. and Broadway, New York City ................................................. Construct Kansas-Garrett Connector and I–20 Interchange Improvements ............................. Construct the SR 1058 Connector between PA 309 and the Pennsylvania Turnpike Northeast Extension in Montgomery County ......... Reconstruct the Interstate 44 193rd street interchange ...................................................... Roadway improvements to Woodbury Rd. at intersection with Syosset-Woodbury Rd ........ Construct a handicapped accessible trail and platform at Kettle Pond Visitor Center Administrative Facility ........................................ Construct Great Swamp National Wildlife Refuge Road .......................................................... Grade Separation at 32nd Street between I–15 and Harbor Drive, San Diego ......................... Widen Old Meridian Street from 2 to 4 lanes, City of Carmel, Indiana .................................. Construct a bicycle/pedestrian path, City of Portage ............................................................. Widen Route 17 in Stafford ............................... Widen Route 820 in Bergton, Virginia .............. Construction of 2 North/South Blvds. and 2 East/West Blvds. in the vicinity of Northern Illinois University ........................................... Begin construction of road from U.S. 395 west towards SR 14 ................................................. Design, engineering, ROW acquisition, and construction of streetscaping enhancements, paving, lighting, safety improvements, parking, and roadway redesign in Old Forge Borough, Lackawanna County ............................. Improvements to Amtrak Keystone Corridor grade crossings at Irishtown Rd., New Comer Rd., and a new bridge at Ebychiques Rd ..................................................................... Acquire and construct trail and bikeway along S. Chickamauga Creek in Chattanooga, TN

AZ

PA

OK TX FL NY LA PA OK NY RI NJ CA IN WI VA VA IL CA PA

PA

TN

Frm 00137

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

Amount

APPS06

$5,000,000

$800,000

$160,000 $6,400,000 $2,080,000 $1,600,000 $4,000,000 $4,000,000 $1,280,000 $2,400,000 $1,600,000 $160,000 $200,000 $800,000 $900,000 $1,760,000 $4,000,000 $1,240,000 $8,320,000 $800,000

$160,000

$400,000 $1,280,000

PsN: PUBL002