Page:United States Statutes at Large Volume 119.djvu/1334

This page needs to be proofread.

[119 STAT. 1316]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1316]

119 STAT. 1316

PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued

No. 1531 1532 1533 1534 1535

1536 1537 1538 1539 1540 1541 1542 1543 1544 1545 1546

1547 1548 1549 1550 1551 1552 1553 1554

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Jkt 039194

PO 00002

State

Project Description

CA

Construction of a smart crosswalk system at the intersection of Arminta St. and Mason Ave .................................................................... Reconstruct U.S. Highway 41 north of Lake Butte des Morts Bridge, Wisconsin ............... Improvements to 8th and 9th Street bridges between Pleasant Valley Blvd. and Valley View Blvd., Altoona, PA ................................. Construction of a direct intermodal truck access road from Interstate 210 to the City Docks of the Port of Lake Charles ................. Construct Links Hike and Bike Trail Project. 2.2 mile trail project connecting Gaylord Texan to Grapevine Mills Mall. Grapvine, TX ..................................................................... Construct sidewalks between Marion Middle School, City Park, and Community Center, Buena Vista ..................................................... Construct a four lane connection between Rt. 13 and Rt. 45 and upgrades to Netty Green Road in Saline Co., Illinois ............................. Plymouth, Haggerty Road from Plymouth Rd. to Schoolcraft Rd ............................................. Provide streetscape improvements and pavement repair, Greenback, Tennessee .............. Reconstruction of NE 56th St, eastern Polk Co Relocate Pocket Road/Lakewood Place for Access to the Racehorse Business Park, Alorton .............................................................. Construct roadway on East Commerce Drive, Oxford, CT ....................................................... Niota, TN Improve vehicle efficiencies at highway At-Grade Railroad Crossing ................... Plan and Construct 17th Street connector in the City of Sarasota, FL ................................. Reconstruction and widening of U.S. Route 5 for the Town of Hartford ................................ Relocate the entrance to the Shaw Nature Reserve that is being altered due to a redesign of the Gray Summit I–44 interchange project ............................................................... Replace and reconstruct South Capitol Street/ Frederick Douglass Memorial Bridge ............ Complete 13.8 miles of nonmotorized pedestrian Fred Meijer Heartland Trail of 30.1 miles ................................................................. Roadway improvements on U.S. 60 from Willow Springs to the Van Buren Area ............... Construct Parley’s Creek Trail .......................... Construction of Calais/St. Stephen Border Crossing Project ............................................... Alleviate congestion at Atlantic Corridor Green-way Network, City of Miami Beach, FL ..................................................................... Construction of MD 331 Dover Bridge .............. Improve Traffic Flow on Noel Road between Church and Crossbay Boulevard including work necessary to demolish and reconstruct the firehouse facility .......................................

WI PA LA TX

GA IL MI TN IA IL CT TN FL VT MO

DC MI MO UT ME FL MD NY

Frm 00173

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

Amount

APPS06

$40,000 $13,000,000 $392,000 $10,400,000

$400,000 $300,000 $1,600,000 $400,000 $200,000 $800,000 $900,000 $400,000 $45,600 $1,600,000 $1,200,000

$400,000 $48,000,000 $2,160,000 $8,000,000 $5,000,000 $7,000,000 $2,000,000 $3,454,400

$1,000,000

PsN: PUBL002