Page:United States Statutes at Large Volume 119.djvu/1366

This page needs to be proofread.

[119 STAT. 1348]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1348]

119 STAT. 1348

PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued

No. 2350 2351

2352 2353 2354 2355 2356 2357 2358 2359

2360 2361

2362 2363 2364 2365 2366

2367 2368 2369 2370 2371 2372 2373 2374 2375

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Jkt 039194

PO 00002

State

Project Description

NY

Construct the Auburn Connector Road Corridor, Auburn, NY ........................................... Engineering and construction of Blackstone Valley Visitors Center at intersection of State Route 146 and Millbury Street, Worcester ......................................................... Improve I–8 off ramp to the Desert Farming Institute, Imperial County ............................. Construct bike and pedestrian path along K– 10 between Douglas and Johnson Counties .. Construct Bike Lanes on Kalanianaole Highway, vicinity of Makapuu to Keolu Drive ...... Donna/Rio Bravo International Bridge ............. Improve Sheridan Road, Evanston .................... Intercounty Connector ........................................ Resurfacing of Ten Mile Road in St. Clair Shores ............................................................... Conduct studies to consider transportation planning and community involvement for infrastructure projects that address congestion relief in New York City ................................... Construct an extension of MO 740 from U.S. 63 to the I–70 Lake of the Woods Interchange .............................................................. Construct improvements to Enterprise Blvd. in Iberville Parish; and LA 1/I–10 Connector Study; and improvements to LA 10/Zachary Taylor Parkway ............................................... Monroe County ITS project ................................ Roadway improvement on I–44 in Phelps County, Missouri ............................................. Rt. 128/95 ramp Northbound to Kendrick Street, Needham .............................................. Realign State Road 312, Hammond .................. Design, engineering, ROW acquisition and construction of surface improvements to the area adjacent to Exit 168 of Interstate 81 at the Wachovia Arena in Wilkes-Barre Township ................................................................... SR 92 relocation from Durelee Road to SR 92 at Malone, including grade separation, Douglas County, Georgia ................................ Construct I–69 Evansville to Indianapolis, Indiana ................................................................. Construct fourth bore of Caldecott Tunnel on SR 24, California ............................................. Construct interchange on I–40 in Wilson County .............................................................. Construct service road parallel to I–69 in the City of Anderson, Indiana .............................. Croton-on-Hudson, NY Restoration of Van Cortlandt Manor entrance road ..................... Construction and repair of pedestrian walkways along Lake Shore Blvd. in Lakeline Village, OH ...................................................... Reconstruct MD 32 from MD 108 to I–70 in Howard County ............................................... Repair and Improve Streets in Astoria damaged by water main breaks ............................

MA

CA KS HI TX IL MD MI NY

MO LA

NY MO MA IN PA

GA IN CA TN IN NY OH MD NY

Frm 00205

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

Amount

APPS06

$800,000

$6,400,000 $800,000 $400,000 $240,000 $1,600,000 $1,600,000 $3,200,000 $716,800

$1,200,000 $2,000,000

$3,200,000 $720,000 $800,000 $1,400,000 $3,330,313

$200,000 $6,400,000 $11,200,000 $1,600,000 $800,000 $3,200,000 $2,000,000 $231,200 $3,040,000 $1,400,000

PsN: PUBL002