Page:United States Statutes at Large Volume 119.djvu/1369

This page needs to be proofread.

[119 STAT. 1351]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1351]

PUBLIC LAW 109–59—AUG. 10, 2005

119 STAT. 1351

Highway Projects High Priority Projects—Continued

No. 2429 2430 2431 2432

2433 2434 2435 2436

2437 2438 2439 2440

2441 2442 2443 2444 2445 2446 2447 2448 2449 2450 2451

VerDate 14-DEC-2004

13:51 Oct 26, 2006

State

Project Description

IL

Construct Parking Facility and pedestrian walkways at 94th and S. Oak Park Ave, Oak Lawn ......................................................... I–15 Freeway Reconstruction—Springville 200 South Interchange ........................................... Washington St. from High St. to Water St., Walpole ............................................................. White’s Mill Trail and Renovation—Design and construction of recreational trail and preservation of watermill for use as visitors center ................................................................ Implement San Francisco Street Improvements Program ................................................ Design, engineering, and construction of Methuen Rotary alternative at I–93 and Routes 110 and 113, Methuen ........................ Improve Mill Street, Rock Island ...................... For the Nanticoke City Redevelopment Authority to design, acquire land, and construct a parking garage, streetscaping enhancements, paving, lighting and safety improvements, and roadway redesign in Nanticoke ................................................................ Widen and reconstruct Walton Boulevard Bridge in Auburn Hills between Opdyke and Squirrel Road ................................................... Widen Delaura Beach Lane and add a bike lane both directions, Warrenton .................... Design and construct the 3-mile long Grand Trunk Trail bikeway from Sturbridge to Southbridge ...................................................... Develop trails, bike paths and recreational facilities on the Crest of Black Mountain, Cumberland County for Cumberland Trail State Park ........................................................ Study and Improve Traffic Flow Improvement at Atlantic Yard Arena Development ............ Upgrade and widen MD 237 from Pegg Road to MD 235 ........................................................ Main Street improvements from Broad Street to Richardson Avenue and Main Street to Madison Avenue, Borough of Lansdale ......... Widen Highway 101 in Marin and Sonoma Counties from Hwy 37 in Novato to Old Redwood Highway in Petaluma ..................... Road and pedestrian safety improvements Main Street, Village of Patchogue ................. Widen Highway 92 from Lehi to Highland ....... Widen I–10 to 3 lanes in each direction north of Tucson from Marana Interchange to Cortato Interchange ........................................ Widen I–238 between I–580 and I–880 in Alameda County .................................................... Widen I–66 westbound inside the Capital Beltway from the Rosslyn Tunnel to the Dulles Connector Road ............................................... Construction of I–74 between I–40 and U.S. 220, High Point, North Carolina .................... Widen I–695, Baltimore Beltway, Southwest ...

UT MA VA

CA MA IL PA

MI OR MA TN

NY MD PA CA NY UT AZ CA VA NC MD

Jkt 039194

PO 00002

Frm 00208

Fmt 6580

Sfmt 6581

Amount

$192,000 $3,600,000 $1,400,000

$400,000 $6,400,000 $600,000 $400,000

$5,600,000 $4,000,000 $148,800 $560,000

$200,000 $2,000,000 $12,000,000 $640,000 $12,000,000 $1,500,000 $2,500,000 $1,360,000 $800,000 $5,600,000 $4,000,000 $3,440,000

E:\PUBLAW\PUBL002.119

APPS06

PsN: PUBL002