Page:United States Statutes at Large Volume 119.djvu/1372

This page needs to be proofread.

[119 STAT. 1354]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1354]

119 STAT. 1354

PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued

No. 2506

2507 2508 2509

2510 2511 2512 2513

2514 2515

2516 2517 2518

2519 2520 2521 2522 2523

2524 2525 2526

2527 2528 2529

2530

2531 2532

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Jkt 039194

PO 00002

State

Project Description

SD

Resurface U.S. Highway 18 from Lake Andes to U.S. Highway 50 on Yankton Sioux Reservation ............................................................ Lajitas Relief Route ............................................ U.S. 85 Passing Lanes ........................................ Design and Construct Blackstone River Bikeway and Worcester Bikeway Pavilion between Providence, RI and Worcester ............. Little Falls Access: Repair and reconstruct High School and Lower School Road ............. Replace Columbus Drive Bridge ........................ ............................................................................... Construction of two railroad-highway grade separations on Farm Lane north of Mount Hope Road ........................................................ Widen Atlantic Bl bridge over the Los Angeles River in Vernon ............................................... Widen Bundy Drive between Wilshire and Santa Monica Boulevards in the City of Los Angeles ............................................................. To provide four lanes on U.S. 80, Perry County, Marengo County, and Sumter County ..... Widen Maine Avenue in Baldwin Park ............. Ease traffic congestion and improve intersection safety by identifying alternative alignment to U.S. 84/285 and NM 68 through Espanola ........................................................... Widen MS Hwy 19 between Philadelphia and Collinsville, MS ............................................... Construct the Fire Island ferry terminal facility, Patchogue .................................................. IL 8 from East Peoria to Washington, IL ......... Preliminary engineering for missing connections of NJ 23 and I–80 .................................. Penobscot Riverfront Development for bicycle trails, amenities, and traffic circulation improvements, Bangor and Brewer ................... Restoration and reconstruction of the central business district street. Cambridge, IL ......... Widen NC 150 from Cherryville to Lincolnton Second phase of the Grand Concourse improvements from East 166th St. to East 171st St ............................................................ U.S. Route 7 and U.S. Route 4 road improvements for the City of Rutland ........................ Improve 63rd Street, Chicago ............................ Alcona County, Reconstruction of Ritchie Road from Village of Lincoln to Hubbard Lake road ................................................................... Construct roadway btwn I–26 and U/S/ 1 in Lexington County. Intermodal connector from U.S. 1 to I–26 and I–77. SC 302 and SC 602 improvements ..................................... Agness Road, Curry County ............................... Rehabilitation of Sharon Drive in the Town of Poughkeepsie ...................................................

TX WY MA

NY FL MI

CA CA

AL CA NM

MS NY IL NJ ME

IL NC NY

VT IL MI

SC

OR NY

Frm 00211

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

Amount

APPS06

$960,000 $1,200,000 $1,600,000

$2,000,000 $192,000 $3,200,000 $0

$1,840,000 $800,000

$3,400,000 $11,200,000 $300,000

$1,600,000 $10,000,000 $1,600,000 $762,056 $1,200,000

$2,800,000 $960,000 $800,000

$8,000,000 $2,848,000 $1,600,000

$650,400

$1,600,000 $2,000,000 $260,000

PsN: PUBL002