119 STAT. 1354
PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued
No. 2506
2507 2508 2509
2510 2511 2512 2513
2514 2515
2516 2517 2518
2519 2520 2521 2522 2523
2524 2525 2526
2527 2528 2529
2530
2531 2532
VerDate 14-DEC-2004
13:51 Oct 26, 2006
Jkt 039194
PO 00002
State
Project Description
SD
Resurface U.S. Highway 18 from Lake Andes to U.S. Highway 50 on Yankton Sioux Reservation ............................................................ Lajitas Relief Route ............................................ U.S. 85 Passing Lanes ........................................ Design and Construct Blackstone River Bikeway and Worcester Bikeway Pavilion between Providence, RI and Worcester ............. Little Falls Access: Repair and reconstruct High School and Lower School Road ............. Replace Columbus Drive Bridge ........................ ............................................................................... Construction of two railroad-highway grade separations on Farm Lane north of Mount Hope Road ........................................................ Widen Atlantic Bl bridge over the Los Angeles River in Vernon ............................................... Widen Bundy Drive between Wilshire and Santa Monica Boulevards in the City of Los Angeles ............................................................. To provide four lanes on U.S. 80, Perry County, Marengo County, and Sumter County ..... Widen Maine Avenue in Baldwin Park ............. Ease traffic congestion and improve intersection safety by identifying alternative alignment to U.S. 84/285 and NM 68 through Espanola ........................................................... Widen MS Hwy 19 between Philadelphia and Collinsville, MS ............................................... Construct the Fire Island ferry terminal facility, Patchogue .................................................. IL 8 from East Peoria to Washington, IL ......... Preliminary engineering for missing connections of NJ 23 and I–80 .................................. Penobscot Riverfront Development for bicycle trails, amenities, and traffic circulation improvements, Bangor and Brewer ................... Restoration and reconstruction of the central business district street. Cambridge, IL ......... Widen NC 150 from Cherryville to Lincolnton Second phase of the Grand Concourse improvements from East 166th St. to East 171st St ............................................................ U.S. Route 7 and U.S. Route 4 road improvements for the City of Rutland ........................ Improve 63rd Street, Chicago ............................ Alcona County, Reconstruction of Ritchie Road from Village of Lincoln to Hubbard Lake road ................................................................... Construct roadway btwn I–26 and U/S/ 1 in Lexington County. Intermodal connector from U.S. 1 to I–26 and I–77. SC 302 and SC 602 improvements ..................................... Agness Road, Curry County ............................... Rehabilitation of Sharon Drive in the Town of Poughkeepsie ...................................................
TX WY MA
NY FL MI
CA CA
AL CA NM
MS NY IL NJ ME
IL NC NY
VT IL MI
SC
OR NY
Frm 00211
Fmt 6580
Sfmt 6581
E:\PUBLAW\PUBL002.119
Amount
APPS06
$960,000 $1,200,000 $1,600,000
$2,000,000 $192,000 $3,200,000 $0
$1,840,000 $800,000
$3,400,000 $11,200,000 $300,000
$1,600,000 $10,000,000 $1,600,000 $762,056 $1,200,000
$2,800,000 $960,000 $800,000
$8,000,000 $2,848,000 $1,600,000
$650,400
$1,600,000 $2,000,000 $260,000
PsN: PUBL002
�