Page:United States Statutes at Large Volume 119.djvu/1392

This page needs to be proofread.

[119 STAT. 1374]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1374]

119 STAT. 1374

PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued

No. 3022 3023 3024 3025 3026 3027 3028 3029 3030 3031 3032 3033

3034 3035 3036 3037 3038 3039

3040 3041 3042 3043 3044 3045 3046 3047 3048 3049 3050 3051 3052 3053

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Jkt 039194

PO 00002

State

Project Description

CA

Valley View/Stage Grade Separation Project, La Mirada and Santa Fe Springs, California Renewal of Wooden Bridge West of Albany ...... Northville, Taft Road from 8 Mile North to city limits ......................................................... Village of Pawling Rehabilitation of Grandview Ave. from Lakeside to end ..................... Pave and curb Cheyenne River Tribe Route 900, ‘‘Chinatown’’ in Eagle Butte ................... Church Street Improvements, Orlando ............. Walled Lake, Widen Maple Road, west of Decker to Welch .............................................. Washington County, Arkansas—Replace and rebuild Tilly Willy Bridge ............................... Russellville Intermodal Facility construct access roads from AR Hwy 247, purchase Right-of-Way .................................................... Construct IH 30 Monty Stratton Parkway Interchange in Greenville, TX ........................ Design and Construction of Portzer Road Connector, Bucks County ...................................... For Plainfield Township Park District to construct DuPage River Bike and Pedestrian Trail linking Grand Illinois, Midewin, and I&M Canal Trails ............................................ Pedestrian Path and Sidewalk Improvements along U.S. 83 in Rio Grande City .................. Upgrade roads at Tougaloo College ................... Washington Street Widening, Gurnee .............. Replacement Bridge for Tunnel, Belle Chasse Implement Busch Boulevard corridor improvements to improve safety in Tampa ................ Construction of Pittsfield Greenways Bridge— Non-motorized bridge enhancement onto existing Bemis Road Bridge, Pittsfield Charter Township .......................................................... North Carolina. Repair and improve safety features on U.S. Highway 19 from Maggie Valley to Cherokee .......................................... Northern Loop Project, City of Wilson .............. Weaver Road Extension and Bridge Project, Douglas County ............................................... Complete 58 miles of White Pine Trail from Grand Rapids to Cadillac ............................... Elmira Congestion Mitigation ............................ Improve Roads and Bridges, Cicero .................. Carlysle Road Reconstruction, Inkster .............. Construct pedestrian safety project on the Navajo Nation in Montezuma Creek ............. Construct MD5, Hughesville Bypass ................. Repair and Construct Rock Spring Bridge, Portage County ................................................ Replace I–195 Washington Bridge Eastbound Bear River Migratory Bird Refuge Access Road Improvements, Box Elder County, UT .......... Reconstruction of Union St. and Rt. 138W, Holbrook ........................................................... Replacement of the interchange at 44th Street and U.S. 131 in Grand Rapids .......................

OR MI NY SD FL MI AR AR TX PA IL

TX MS IL LA FL MI

NC NC OR MI NY IL MI UT MD OH RI UT MA MI

Frm 00231

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

Amount

APPS06

$720,000 $7,500,000 $400,000 $80,000 $1,200,000 $11,200,000 $100,000 $800,000 $2,000,000 $1,200,000 $1,600,000

$80,000 $400,000 $400,000 $2,688,000 $400,000 $2,000,000

$160,800 $11,360,000 $800,000 $17,000,000 $2,240,000 $1,800,000 $1,200,000 $2,000,000 $325,000 $8,000,000 $500,000 $1,600,000 $3,600,000 $1,220,000 $7,200,000

PsN: PUBL002