Page:United States Statutes at Large Volume 119.djvu/1418

This page needs to be proofread.

[119 STAT. 1400]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1400]

119 STAT. 1400

PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued

No. 3727 3728 3729 3730 3731 3732 3733 3734 3735 3736 3737 3738 3739

3740 3741 3742 3743 3744 3745 3746 3747 3748 3749 3750 3751 3752 3753

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Jkt 039194

PO 00002

State

Project Description

AK

Anchorage: Transportation needs for Glacier/ Winner Creek Development ........................... Preliminary Engineering, Design, ROW Acquisition and Construction of the Tuscaloosa Bypass .............................................................. Preliminary Engineering, Design, ROW Acquisition and Construction of the I–10 Connector ................................................................ Preliminary Engineering, Design, ROW Acquisition and Construction of the I–85 Extension ................................................................... To construct approximately 13 mile four lane thoroughfare to connect the Foley Beach Express to I–10/Highway 83 Baldwin County ... To construct a new interchange on I–85 at Beehive Road in Auburn, AL ......................... To widen Highway 84 to 4 lanes west of I–65 from Evergreen to Monroeville and beyond to the Alabama State line ............................... I–65 Widening from U.S. 31 in Alabaster (Exit 238) to AL 25 in Calera (Exit 228) ................ Northeast Arkansas Connector (relocation of Highway 226) ................................................... Interchange Modification to I–430/I–630 .......... Hot Springs Extension, East-West Arterial: Highway 70 to Highways 5/7 ......................... Caraway Bridge Overpass .................................. Highway 67: Kiehl Avenue—Vandenberg Boulevard: rehabilitating and widening Highway 67 from four to six lanes from Kiehl Ave. to Vandenberg Blvd ................................ Improve State Hwy 88 (Higdon Ferry Road) in Hot Springs ...................................................... I–40/Highway 89 Interchange Planning and Construction .................................................... Conway, AR Western Loop—For engineering, rights-of-way, relocations, and continued planning and design ........................................ Develop a railroad overpass connecting U.S. Highway 67 and U.S. Highway 371 in Prescott .................................................................... Highway 77 Rail Grade Separation in Marion Maumelle Interchange—For third entrance into Maumelle .................................................. Rogers—Construct new interchange on I–540 near the existing Perry Road overpass .......... Construction of I–49, Highway 71: Highway 22 to Highway 71 near Jenny Lind .................... Highway 165: Railroad Overpass Construction Improve Highway 412: Baxter Co. to Ash Flat Highway 412 Relocation: Paragould South Bypass ................................................................... Widening of Highway 65/82: Pine Bluff-Greenville Bridge ....................................................... Highway 167 Widening: Fordyce to Sheridan Bypass .............................................................. Fort Smith: Improvements to Jenny Lind Rd. and Ingersoll ....................................................

AL AL AL AL AL AL AL AR AR AR AR AR

AR AR AR AR AR AR AR AR AR AR AR AR AR AR

Frm 00257

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

Amount

APPS06

$1,000,000 $25,000,000 $15,000,000 $50,000,000 $18,000,000 $18,000,000 $4,000,000 $5,000,000 $10,600,000 $15,000,000 $10,000,000 $1,800,000

$4,000,000 $3,000,000 $3,000,000 $2,000,000 $528,000 $3,000,000 $1,500,000 $3,372,000 $1,000,000 $2,000,000 $1,000,000 $1,000,000 $2,000,000 $2,000,000 $1,200,000

PsN: PUBL002