Page:United States Statutes at Large Volume 119.djvu/1437

This page needs to be proofread.

[119 STAT. 1419]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1419]

PUBLIC LAW 109–59—AUG. 10, 2005

119 STAT. 1419

Highway Projects High Priority Projects—Continued

No. 4231 4232 4233 4234 4235 4236

4237 4238 4239 4240 4241 4242 4243 4244 4245 4246 4247 4248 4249 4250 4251 4252 4253 4254 4255 4256 4257

VerDate 14-DEC-2004

13:51 Oct 26, 2006

State

Project Description

LA

Further construction to improve draining at Clearview Parkway (LA 3152) and Earhart Expressway (LA3139) ..................................... Study of Baton Rouge Loop Project ................... Water Well Road Gateway Corridor (LA 478)—design, right-of-way, and construction of 3.6 miles from I–49 to LA 1 ....................... Widen LA 18 from Northrup Grumman/ Avondale Shipyards to U.S. 90, Jefferson Parish ............................................................... Red River National Wildlife Refuge Visitor Center ............................................................... Construct ROW improvements from Third St. at James St. to LA Hwy One at Broadway St. Acquire property at Third St. and Winn St ...................................................................... West Lake Overpass—To make grade separation interchange improvements at Sampson Street ................................................................ Improve by widening, realigning, and resurface 3.2 miles of LA Hwy 820 between LA Hwy 145 and LA Hwy 821 ............................. Connection between Highway 51 By-Pass and Old Baton Rouge Highway 1040—Hammond LA 3224—Hemlock Street at U.S. 61 improvements—St. John the Baptist Parish .............. Louisiana Interstate 49 South Corridor ............ Design and acquire right-of-way, Louisiana I– 69, Louisiana Segment, SIU 15 ..................... Construction to improve drainage at Clearview Parkway (LA 3152) and Earhart Expressway (LA 3139) .................................................. Shreveport Intelligent Transportation System in Northwest, LA ............................................. Widen I–10 in New Orleans ............................... St. Tammany U.S. 11 bicycle path and sidewalk improvements ......................................... Bossier Parish Congestion Relief Program ....... I–10 Ryan Street exit ramp and relocation/realignments ....................................................... Improve Zachary Taylor Parkway ..................... LA-1 drainage and sidewalk improvements in Grande Isle ...................................................... Construct I–20 interchanges at U.S. 167 at Tarbutton Rd. Construct East West Frontage Roads along I–20 ...................................... Louisiana University Consortium for Smart Growth Study and Educational Outreach ..... Upgrade El Camino East-West Corridor along LA 6 .................................................................. Develop and construct St. Martinville Bypass, LA 31 North to LA 96 ..................................... Construct Leeville Bridge from Port Fouchon to Golden Meadow ........................................... Improve Natchitoches Johnson Chute and Posey Road connection to I–49 to LA 1 ......... LA 50 (Almedia) widening and I–310/U.S. 90 interchange improvements, St. Charles Parish .....................................................................

LA LA LA LA LA

LA LA LA LA LA LA LA LA LA LA LA LA LA LA LA LA LA LA LA LA LA

Jkt 039194

PO 00002

Frm 00276

Fmt 6580

Sfmt 6581

Amount

$3,585,000 $500,000 $831,000 $1,325,000 $850,000

$400,000 $2,200,000 $400,000 $100,000 $519,000 $7,500,000 $2,500,000 $900,000 $1,500,000 $2,000,000 $2,000,000 $1,500,000 $1,500,000 $2,000,000 $1,500,000 $1,500,000 $2,000,000 $1,500,000 $1,000,000 $1,000,000 $500,000 $500,000

E:\PUBLAW\PUBL002.119

APPS06

PsN: PUBL002