Page:United States Statutes at Large Volume 119.djvu/1440

This page needs to be proofread.

[119 STAT. 1422]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1422]

119 STAT. 1422

PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued

No. 4314 4315 4316 4317 4318 4319 4320 4321 4322

4323 4324 4325 4326 4327 4328

4329 4330 4331 4332 4333 4334 4335 4336 4337 4338

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Jkt 039194

PO 00002

State

Project Description

MD

Construct Woodrow Wilson Bridge Anacostia River wetlands mitigation project .................. Construct Potomac River Gorge stormwater mitigation project ............................................ I–295 improvements in Portland ....................... Construction of Calais/St. Stephan Border Crossing Project, Calais .................................. Improvements and construction of the Lewiston-Auburn Highway, Lewiston ..................... Replacement of Waldo-Hancock bridge and construction of related pedestrian walkways Transportation improvements for Maine EastWest Corridor Project ..................................... Augusta Memorial Bridge improvements, Augusta ................................................................. Plan and construct North-South Aroostook highways, to improve access to St. John Valley, including Presque Isle Bypass and other improvements .................................................. Construction of an Intermodal Center in Acadia Park, Bar Harbor ...................................... Replacement of the Route 201–A ‘‘covered’’ bridge, Norridgewock ...................................... Repair and improvements of Richmond-Dresden Bridge, Richmond-Dresden ...................... Access and traffic improvements to Route 15 in Brewer ......................................................... State of Maine Pedestrian and Bicycle Trail Project .............................................................. Plan and construct North-South Aroostook highways, to improve access to St. John Valley, including Presque Isle Bypass and other improvements .................................................. Construction of the Gorham Village Bypass, Gorham ............................................................ Improvements for statewide bike and pedestrian projects .................................................... Repair and improvement of Harpswell Cribstone Bridge, Harpswell .......................... Repair and improvement of Deer Isle-Sedgwick Bridge, Deer Isle-Sedgwick .................... Plan and construct, land acquisition, Detroit West Riverfront Greenway ............................. Reconstruct and widen I–94 in Kalamazoo ...... Construct Interchange at I–675 and M–13 (Washington Avenue), Northbound exit, in Saginaw ............................................................ Rehabilitate bridge lift over Black River on 7th Street Bridge in Port Huron .................... Reconstruct I–75 from North of U.S.–2 to Sault Ste. Marie and reconstruct the existing roadway, Sault Ste. Marie ....................... Construct at-grade crossing and I–75 interchange to reconnect Milbocker and McCoy Roads and construct overpass to reconnect Van Tyle to South Wisconsin Road in Gaylord ...................................................................

MD ME ME ME ME ME ME ME

ME ME ME ME ME ME

ME ME ME ME MI MI MI MI MI MI

Frm 00279

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

Amount

APPS06

$1,600,000 $500,000 $15,000,000 $4,000,000 $2,000,000 $18,000,000 $18,000,000 $6,000,000

$5,000,000 $4,000,000 $6,000,000 $3,750,000 $1,250,000 $1,000,000

$20,000,000 $2,000,000 $1,000,000 $3,000,000 $10,000,000 $9,000,000 $8,000,000 $8,000,000 $5,000,000 $6,000,000

$5,000,000

PsN: PUBL002