Page:United States Statutes at Large Volume 119.djvu/3534

This page needs to be proofread.

[119 STAT. 3516]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 3516]

119 STAT. 3516

PUBLIC LAW 109–163—JAN. 6, 2006

contract, and a comparison of costs between a 10-year contract and the longer-term contract.’’. (d) CONFORMING AMENDMENTS.—Such section is further amended— (1) in subsection (f), as redesignated by subsection (c)(1), by striking the second sentence; and (2) in subsection (h), as redesignated by subsection (c)(1), by striking ‘‘subsection (e)’’ and inserting ‘‘subsection (a)(2)’’. (e) TEMPORARY LIMITATION ON USE OF CONVEYANCE AUTHORITY.—During each of fiscal years 2006 and 2007, the number of utility systems, or parts of utility systems, for which conveyance contracts may be entered into under section 2688 of title 10, United States Code, shall not exceed 25 percent of the total number of utility systems that, as of the date of the enactment of this Act, have been determined to be eligible for conveyance under such section, but have not yet been conveyed. (f) REPORT ON USE OF CONVEYANCE AUTHORITY.—Not later than April 1, 2006, the Secretary of Defense shall submit to the congressional defense committees a report describing the use of section 2688 of title 10, United States Code, to convey utility systems, or parts of utility systems. The report shall contain the following: (1) A discussion of the methodology by which a military department conducts the economic analyses of proposed utility system conveyances under section 2688 of title 10, United States Code, including the economic analyses referred to in subsection (a)(2) of such section, and any guidance issued by the Department of Defense related to conducting such economic analyses. (2) A list of the steps taken to ensure the reliability of completed economic analyses, including post-conveyance reviews of actual costs and savings to the United States versus the costs and savings anticipated in the economic analyses. (3) A review of the costs and savings to the United States resulting from each utility system conveyance carried out under such section. (4) A discussion of the feasibility of obtaining consideration equal to the fair market value of a conveyed utility system, as authorized by subsection (c) of such section, and any guidance issued by the Department of Defense related to implementing that requirement, and the effect of that requirement and guidance on the costs and savings to the United States resulting from procuring by contract the utility services provided by the utility system. (5) A discussion of the effects that permanent conveyance of ownership in a utility system may have on the ability of the Secretary of a military department to renegotiate contracts for utility services provided by the utility system or to procure such services from another source. (6) A comparison of the value of contracts to permanently convey ownership in a utility system versus contracts that include reversion of the utility system to Government ownership at the end of a specified contractual period, with regards to contract terms, short- and long-term costs to the Government, system condition at the end of a contract, liability and costs associated with termination before the end of a contract, and

VerDate 14-DEC-2004

07:21 Oct 30, 2006

Jkt 039194

PO 00003

Frm 00984

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL003.119

APPS06

PsN: PUBL003