Page:United States Statutes at Large Volume 119.djvu/977

This page needs to be proofread.

[119 STAT. 959]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 959]

PUBLIC LAW 109–58—AUG. 8, 2005

119 STAT. 959

Organization never allocated financial transmission rights on its system that pertained to a period before January 1, 2005, with respect to any application by such Transmission Organization that would change its methodology the Commission shall exercise its authority in a manner consistent with the Act and that takes into account the policies expressed in subsections (b)(1), (b)(2), and (b)(3) as applied to firm transmission rights held by a loadserving entity as of January 1, 2005, to the extent the associated generation ownership or power purchase arrangements remain in effect. ‘‘(d) CERTAIN TRANSMISSION RIGHTS.—The Commission may exercise authority under this Act to make transmission rights not used to meet an obligation covered by subsection (b) available to other entities in a manner determined by the Commission to be just, reasonable, and not unduly discriminatory or preferential. ‘‘(e) OBLIGATION TO BUILD.—Nothing in this Act relieves a load-serving entity from any obligation under State or local law to build transmission or distribution facilities adequate to meet the service obligations of the load-serving entity. ‘‘(f) CONTRACTS.—Nothing in this section shall provide a basis for abrogating any contract or service agreement for firm transmission service or rights in effect as of the date of the enactment of this subsection. If an ISO in the Western Interconnection had allocated financial transmission rights prior to the date of enactment of this section but had not done so with respect to one or more load-serving entities’ firm transmission rights held under contracts to which the preceding sentence applies (or held by reason of ownership or future ownership of transmission facilities), such load-serving entities may not be required, without their consent, to convert such firm transmission rights to tradable or financial rights, except where the load-serving entity has voluntarily joined the ISO as a participating transmission owner (or its successor) in accordance with the ISO tariff. ‘‘(g) WATER PUMPING FACILITIES.—The Commission shall ensure that any entity described in section 201(f) that owns transmission facilities used predominately to support its own water pumping facilities shall have, with respect to the facilities, protections for transmission service comparable to those provided to load-serving entities pursuant to this section. ‘‘(h) ERCOT.—This section shall not apply within the area referred to in section 212(k)(2)(A). ‘‘(i) JURISDICTION.—This section does not authorize the Commission to take any action not otherwise within the jurisdiction of the Commission. ‘‘(j) TVA AREA.—(1) Subject to paragraphs (2) and (3), for purposes of subsection (b)(1)(B), a load-serving entity that is located within the service area of the Tennessee Valley Authority and that has a firm wholesale power supply contract with the Tennessee Valley Authority shall be considered to hold firm transmission rights for the transmission of the power provided. ‘‘(2) Nothing in this subsection affects the requirements of section 212(j). ‘‘(3) The Commission shall not issue an order on the basis of this subsection that is contrary to the purposes of section 212(j). ‘‘(k) EFFECT OF EXERCISING RIGHTS.—An entity that to the extent required to meet its service obligations exercises rights

VerDate 14-DEC-2004

08:19 Oct 26, 2006

Jkt 039194

PO 00001

Frm 00957

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL001.119

APPS06

PsN: PUBL001