Page:United States Statutes at Large Volume 121.djvu/1073

This page needs to be proofread.
[121 STAT. 1052]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1052]

121 STAT. 1052

PUBLIC LAW 110–114—NOV. 8, 2007

dkrause on GSDDPC44 with PUBLAW

and Southern Florida, authorized by section 203 of the Flood Control Act of 1968 (82 Stat. 740), at a total cost of $15,471,000, with an estimated Federal cost of $8,073,000 and an estimated non-Federal cost of $7,398,000. (iii) The uncompleted portions of the East Coast Backpumping, St. Lucie–Martin County, Spillway Structure S–311 modifications to the project for Central and Southern Florida, authorized by section 203 of the Flood Control Act of 1968 (82 Stat. 740), at a total cost of $77,118,000, with an estimated Federal cost of $55,124,000 and an estimated non-Federal cost of $21,994,000. (15) COMPREHENSIVE EVERGLADES RESTORATION PLAN, CENTRAL AND SOUTHERN FLORIDA, PICAYUNE STRAND RESTORATION PROJECT, COLLIER COUNTY, FLORIDA.—The project for ecosystem restoration, Comprehensive Everglades Restoration Plan, Central and Southern Florida, Picayune Strand Restoration Project, Collier County, Florida: Report of the Chief of Engineers dated September 15, 2005, at a total cost of $375,330,000 with an estimated Federal cost of $187,665,000 and an estimated nonFederal cost of $187,665,000. (16) COMPREHENSIVE EVERGLADES RESTORATION PLAN, CENTRAL AND SOUTHERN FLORIDA, SITE 1 IMPOUNDMENT PROJECT, PALM BEACH COUNTY, FLORIDA.—The project for ecosystem restoration, Comprehensive Everglades Restoration Plan, Central and Southern Florida, Site 1 Impoundment Project, Palm Beach County, Florida: Report of the Chief of Engineers dated December 19, 2006, at a total cost of $80,840,000, with an estimated Federal cost of $40,420,000 and an estimated nonFederal cost of $40,420,000. (17) MIAMI HARBOR, MIAMI-DADE COUNTY, FLORIDA.— (A) IN GENERAL.—The project for navigation, Miami Harbor, Miami-Dade County, Florida: Report of the Chief of Engineers dated April 25, 2005, at a total cost of $125,270,000, with an estimated Federal cost of $75,140,000 and an estimated non-Federal cost of $50,130,000. (B) GENERAL REEVALUATION REPORT.—The non-Federal share of the cost of the general reevaluation report that resulted in the report of the Chief of Engineers referred to in subparagraph (A) shall be the same percentage as the non-Federal share of cost of construction of the project. (C) AGREEMENT.—The Secretary shall enter into a new partnership with the non-Federal interest to reflect the cost sharing required by subparagraph (B). (18) EAST ST. LOUIS AND VICINITY, ILLINOIS.—The project for environmental restoration and recreation, East St. Louis and Vicinity, Illinois: Report of the Chief of Engineers dated December 22, 2004, at a total cost of $208,260,000, with an estimated Federal cost of $134,910,000 and an estimated nonFederal cost of $73,350,000. (19) PEORIA RIVERFRONT DEVELOPMENT, ILLINOIS.—The project for environmental restoration, Peoria Riverfront Development, Illinois: Report of the Chief of Engineers dated July 28, 2003, at a total cost of $18,220,000, with an estimated

VerDate Aug 31 2005

13:52 Jan 23, 2009

Jkt 059194

PO 00001

Frm 01050

Fmt 6580

Sfmt 6581

M:\STATUTES\2007\59194PT1.001

APPS10

PsN: 59194PT1