Page:United States Statutes at Large Volume 121.djvu/1076

This page needs to be proofread.
[121 STAT. 1055]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1055]

PUBLIC LAW 110–114—NOV. 8, 2007

121 STAT. 1055

dkrause on GSDDPC44 with PUBLAW

and at an estimated total cost of $119,680,000 for periodic beach nourishment over the 50-year life of the project, with an estimated Federal cost of $59,840,000 and an estimated non-Federal cost of $59,840,000. (33) RARITAN BAY AND SANDY HOOK BAY, UNION BEACH, NEW JERSEY.—The project for hurricane and storm damage reduction, Raritan Bay and Sandy Hook Bay, Union Beach, New Jersey: Report of the Chief of Engineers dated January 4, 2006, at a total cost of $115,000,000, with an estimated Federal cost of $74,800,000 and an estimated non-Federal cost of $40,200,000, and at an estimated total cost of $6,500,000 for periodic nourishment over the 50-year life of the project, with an estimated Federal cost of $3,250,000 and an estimated non-Federal cost of $3,250,000. (34) SOUTH RIVER, RARITAN RIVER BASIN, NEW JERSEY.— The project for hurricane and storm damage reduction and environmental restoration, South River, Raritan River Basin, New Jersey: Report of the Chief of Engineers dated July 22, 2003, at a total cost of $122,300,000, with an estimated Federal cost of $79,500,000 and an estimated non-Federal cost of $42,800,000. (35) SOUTHWEST VALLEY, BERNALILLO COUNTY, NEW MEXICO.—The project for flood damage reduction, Southwest Valley, Bernalillo County, New Mexico: Report of the Chief of Engineers dated November 29, 2004, at a total cost of $24,840,000, with an estimated Federal cost of $16,150,000 and an estimated non-Federal cost of $8,690,000. (36) MONTAUK POINT, NEW YORK.—The project for hurricane and storm damage reduction, Montauk Point, New York: Report of the Chief of Engineers dated March 31, 2006, at a total cost of $14,600,000, with an estimated Federal cost of $7,300,000 and an estimated non-Federal cost of $7,300,000. (37) HOCKING RIVER BASIN, MONDAY CREEK, OHIO.— (A) IN GENERAL.—The project for ecosystem restoration, Hocking River Basin, Monday Creek, Ohio: Report of the Chief of Engineers dated August 24, 2006, at a total cost of $20,980,000, with an estimated Federal cost of $13,440,000 and an estimated non-Federal cost of $7,540,000. (B) WAYNE NATIONAL FOREST.— (i) IN GENERAL.—The Secretary, in cooperation with the Secretary of Agriculture, may construct other project features on property that is located in the Wayne National Forest, Ohio, owned by the United States and managed by the Forest Service as described in the report of the Corps of Engineers entitled ‘‘Hocking River Basin, Ohio, Monday Creek Sub-Basin Ecosystem Restoration Project Feasibility Report and Environmental Assessment’’. (ii) COST.—Each project feature carried out on Federal land shall be designed, constructed, operated, and maintained at Federal expense. (iii) AUTHORIZATION OF APPROPRIATIONS.—There is authorized to be appropriated to the Secretary of Agriculture to carry out this subparagraph $1,270,000. (38) TOWN OF BLOOMSBURG, COLUMBIA COUNTY, PENNSYLVANIA.—The project for flood damage reduction, town of

VerDate Aug 31 2005

13:52 Jan 23, 2009

Jkt 059194

PO 00001

Frm 01053

Fmt 6580

Sfmt 6581

M:\STATUTES\2007\59194PT1.001

APPS10

PsN: 59194PT1