Page:United States Statutes at Large Volume 121.djvu/1114

This page needs to be proofread.
[121 STAT. 1093]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1093]

PUBLIC LAW 110–114—NOV. 8, 2007

121 STAT. 1093

dkrause on GSDDPC44 with PUBLAW

‘‘(B) INCLUSIONS.—A specific mitigation plan for a water resources project under paragraph (1) shall include, at a minimum— ‘‘(i) a plan for monitoring the implementation and ecological success of each mitigation measure, including the cost and duration of any monitoring, and, to the extent practicable, a designation of the entities that will be responsible for the monitoring; ‘‘(ii) the criteria for ecological success by which the mitigation will be evaluated and determined to be successful based on replacement of lost functions and values of the habitat, including hydrologic and vegetative characteristics; ‘‘(iii) a description of the land and interests in land to be acquired for the mitigation plan and the basis for a determination that the land and interests are available for acquisition; ‘‘(iv) a description of— ‘‘(I) the types and amount of restoration activities to be conducted; ‘‘(II) the physical action to be undertaken to achieve the mitigation objectives within the watershed in which such losses occur and, in any case in which the mitigation will occur outside the watershed, a detailed explanation for undertaking the mitigation outside the watershed; and ‘‘(III) the functions and values that will result from the mitigation plan; and ‘‘(v) a contingency plan for taking corrective actions in cases in which monitoring demonstrates that mitigation measures are not achieving ecological success in accordance with criteria under clause (ii). ‘‘(C) RESPONSIBILITY FOR MONITORING.—In any case in which it is not practicable to identify in a mitigation plan for a water resources project the entity responsible for monitoring at the time of a final report of the Chief of Engineers or other final decision document for the project, such entity shall be identified in the partnership agreement entered into with the non-Federal interest under section 221 of Flood Control Act of 1970 (42 U.S.C. 1962d–5b). ‘‘(4) DETERMINATION OF SUCCESS.— ‘‘(A) IN GENERAL.—A mitigation plan under this subsection shall be considered to be successful at the time at which the criteria under paragraph (3)(B)(ii) are achieved under the plan, as determined by monitoring under paragraph (3)(B)(i). ‘‘(B) CONSULTATION.—In determining whether a mitigation plan is successful under subparagraph (A), the Secretary shall consult annually with appropriate Federal agencies and each State in which the applicable project is located on at least the following: ‘‘(i) The ecological success of the mitigation as of the date on which the report is submitted. ‘‘(ii) The likelihood that the mitigation will achieve ecological success, as defined in the mitigation plan. ‘‘(iii) The projected timeline for achieving that success.

VerDate Aug 31 2005

13:52 Jan 23, 2009

Jkt 059194

PO 00001

Frm 01091

Fmt 6580

Sfmt 6581

M:\STATUTES\2007\59194PT1.001

APPS10

PsN: 59194PT1