[121 STAT. 1108]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1108]

121 STAT. 1108

PUBLIC LAW 110–114—NOV. 8, 2007

3711) and section 302 of the Water Resources Development Act of 2000 (114 Stat. 2600), is modified to authorize the Secretary to construct the project at a total cost of $25,410,000, with an estimated Federal cost of $22,930,000 and an estimated non-Federal cost of $2,480,000. SEC. 3009. TUCSON DRAINAGE AREA, ARIZONA.

The project for flood damage reduction, environmental restoration, and recreation, Tucson drainage area, Arizona, authorized by section 101(a)(5) of the Water Resources Development Act of 1999 (113 Stat. 274), is modified to authorize the Secretary to construct the project at a total cost of $66,700,000, with an estimated Federal cost of $43,350,000 and an estimated non-Federal cost of $23,350,000. SEC. 3010. OSCEOLA HARBOR, ARKANSAS.

(a) IN GENERAL.—The project for navigation, Osceola Harbor, Arkansas, constructed under section 107 of the River and Harbor Act of 1960 (33 U.S.C. 577), is modified to allow non-Federal interests to construct a mooring facility within the existing authorized harbor channel, subject to all necessary permits, certifications, and other requirements. (b) LIMITATION ON STATUTORY CONSTRUCTION.—Nothing in this section shall be construed as affecting the responsibility of the Secretary to maintain the general navigation features of the project at a bottom width of 250 feet. SEC. 3011. ST. FRANCIS RIVER BASIN, ARKANSAS AND MISSOURI.

The project for flood control, St. Francis River Basin, Arkansas and Missouri, authorized by the Act of June 15, 1936 (49 Stat. 1508), is modified to authorize the Secretary to undertake channel stabilization and sediment removal measures on the St. Francis River and tributaries as a nonseparable element of the original project. SEC. 3012. PINE MOUNTAIN DAM, ARKANSAS.

The Pine Mountain Dam feature of the project for flood protection, Lee Creek, Arkansas and Oklahoma, authorized by section 204 of the Flood Control Act of 1965 (79 Stat. 1078), is modified— (1) to add environmental restoration as a project purpose; and (2) to direct the Secretary to finance the non-Federal share of the cost of the project, including treatment and distributions components, over a 30-year period in accordance with section 103(k) of the Water Resources Development Act of 1986 (33 U.S.C. 2213(k)). SEC. 3013. RED-OUACHITA RIVER BASIN LEVEES, ARKANSAS AND LOUISIANA.

dkrause on GSDDPC44 with PUBLAW

(a) IN GENERAL.—Section 204 of the Flood Control Act of 1950 (64 Stat. 173) is amended in the matter under the heading ‘‘REDOUACHITA RIVER BASIN’’ by striking ‘‘improvements at Calion, Arkansas’’ and inserting ‘‘improvements at Calion, Arkansas (including authorization for the comprehensive flood-control project for Ouachita River and tributaries, incorporating in the project all flood control, drainage, and power improvements in the basin above the lower end of the left bank Ouachita River levee)’’.