Page:United States Statutes at Large Volume 121.djvu/1133

This page needs to be proofread.
[121 STAT. 1112]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1112]

121 STAT. 1112

PUBLIC LAW 110–114—NOV. 8, 2007

SEC. 3026. PINOLE CREEK, CALIFORNIA.

The project for improvement of the quality of the environment, Pinole Creek Phase I, California, being carried out under section 1135 of the Water Resources Development Act of 1986 (33 U.S.C. 2309a), is modified to direct the Secretary to credit, in accordance with section 221 of the Flood Control Act of 1970 (42 U.S.C. 1962d– 5b), toward the non-Federal share of the cost of the project the cost of work carried out by the non-Federal interest for the project before the date of the partnership agreement for the project. SEC. 3027. PRADO DAM, CALIFORNIA.

Upon completion of the modifications to the Prado Dam element of the project for flood control, Santa Ana River Mainstem, California, authorized by section 401(a) of the Water Resources Development Act of 1986 (100 Stat. 4113), the Memorandum of Agreement for the Operation for Prado Dam for Seasonal Additional Water Conservation between the Department of the Army and the Orange County Water District (including all the conditions and stipulations in the memorandum) shall remain in effect for volumes of water made available prior to such modifications. SEC. 3028. REDWOOD CITY NAVIGATION CHANNEL, CALIFORNIA.

The Secretary may dredge the Redwood City Navigation Channel, California, on an annual basis, to maintain the authorized depth of –30 feet mean lower low water. SEC. 3029. SACRAMENTO AND AMERICAN RIVERS FLOOD CONTROL, CALIFORNIA.

dkrause on GSDDPC44 with PUBLAW

(a) NATOMAS LEVEE FEATURES.— (1) IN GENERAL.—The project for flood control and recreation, Sacramento and American Rivers, California (Natomas Levee features), authorized by section 9159 of the Department of Defense Appropriations Act, 1993 (106 Stat. 1944), is modified to direct the Secretary to credit $20,503,000 to the Sacramento Area Flood Control Agency for the nonreimbursed Federal share of costs incurred by the Agency in connection with the project. (2) ALLOCATION OF CREDIT.—The Secretary shall allocate the amount to be credited pursuant to paragraph (1) toward the non-Federal share of such projects as are requested by the Sacramento Area Flood Control Agency. (b) JOINT FEDERAL PROJECT AT FOLSOM DAM.— (1) IN GENERAL.—The project for flood control, American and Sacramento Rivers, California, authorized by section 101(a)(6)(A) of the Water Resources Development Act of 1999 (113 Stat. 274) and modified by section 128 of the Energy and Water Development Appropriations Act, 2006 (119 Stat. 2259), is modified to authorize the Secretary to construct the auxiliary spillway generally in accordance with the Post Authorization Change Report, American River Watershed Project (Folsom Dam Modification and Folsom Dam Raise Projects), dated March 2007, at a total cost of $683,000,000, with an estimated Federal cost of $444,000,000 and an estimated non-Federal cost of $239,000,000. (2) DAM SAFETY.—Nothing in this subsection limits the authority of the Secretary of the Interior to carry out dam safety activities in connection with the auxiliary spillway in

VerDate Aug 31 2005

13:52 Jan 23, 2009

Jkt 059194

PO 00001

Frm 01110

Fmt 6580

Sfmt 6581

M:\STATUTES\2007\59194PT1.001

APPS10

PsN: 59194PT1