SEC. 7010. EXPEDITED REPORTS.

(a) IN GENERAL.—The Secretary shall expedite completion of the reports for the following projects and, if the Secretary determines that a project is feasible, proceed directly to project preconstruction engineering and design: (1) The projects identified in the study of comprehensive hurricane protection authorized by title I of the Energy and Water Development Appropriations Act, 2006 (119 Stat. 2447). (2) The projects identified in the Southwest Coastal Louisiana hurricane and storm damage reduction study authorized by the Committee on Transportation and Infrastructure of the House of Representatives on December 7, 2005. (b) SUBMISSION OF REPORTS.—Upon completion of the reports identified in subsection (a), the Secretary shall submit the reports to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives. SEC. 7011. REPORTING.

Not later than 6 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report, including a description of— (1) the projects authorized and undertaken under this title; (2) the construction status of the projects; (3) the cost to date and the expected final cost of each project undertaken under this title; and (4) the benefits and environmental impacts of the projects. SEC. 7012. NEW ORLEANS AND VICINITY.

dkrause on GSDDPC44 with PUBLAW

(a) IN GENERAL.—The Secretary is authorized to— (1) raise levee heights where necessary and otherwise enhance the Lake Pontchartrain and Vicinity project and the West Bank and Vicinity project to provide the level of protection necessary to achieve the certification required for a 100-year level of flood protection in accordance with the national flood insurance program under the base flood elevations current at the time of construction of the levee; (2) modify the 17th Street, Orleans Avenue, and London Avenue drainage canals in the city of New Orleans and install pumps and closure structures at or near the lakefront at Lake Pontchartrain; (3) armor critical elements of the New Orleans hurricane and storm damage reduction system; (4) modify the Inner Harbor Navigation Canal to increase the reliability of the flood protection system for the city of New Orleans; (5) replace or modify certain non-Federal levees in Plaquemines Parish to incorporate the levees into the New Orleans to Venice Hurricane Protection project; (6) reinforce or replace flood walls in the existing Lake Pontchartrain and Vicinity project and the existing West Bank and Vicinity project to improve performance of the flood and storm damage reduction systems;