Page:United States Statutes at Large Volume 121.djvu/1967

This page needs to be proofread.
[121 STAT. 1946]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1946]

121 STAT. 1946

dkrause on GSDDPC44 with PUBLAW

16 USC 460–3a.

VerDate Aug 31 2005

07:12 Jan 26, 2009

PUBLIC LAW 110–161—DEC. 26, 2007

Federal sponsor for work performed by the non-Federal sponsor before or after the execution of a project cooperation agreement, if the Secretary determines that such work is integral to the project. ‘‘(C) The Secretary is authorized to credit towards the non-Federal share of project costs the costs incurred by the non-Federal sponsor for work performed by the nonFederal sponsor before or after the execution of a project cooperation agreement, if the Secretary determines that such work is integral to the project.’’ SEC. 120. NAVAJO RESERVATION, ARIZONA, NEW MEXICO, AND UTAH.—Section 520(b) of the Water Resources Development Act of 1999 (Public Law 106–53; 113 Stat. 345) is amended by inserting after the second sentence ‘‘The local match for the funds appropriated for flood plain delineation on the Navajo reservation in Arizona, New Mexico, and Utah may be provided as in-kind services.’’. SEC. 121. The Secretary of the Army may, under such terms and conditions as the Secretary deems appropriate, contract with any public or private entity to provide visitor reservation services. Any such contract in effect on or after October 1, 2004, may provide that the contractor shall be permitted to deduct a commission to be fixed by the Secretary from the amount charged the public for providing such services and to remit the net proceeds therefrom to the contracting agency. SEC. 122. The project for flood control, Redwood River, Marshall, Minnesota, authorized by section 401(a) of the Water Resources Development Act of 1986 and modified by section 4(k) of the Water Resources Development Act of 1988 is further modified to authorize the Secretary to construct the project at a total cost of $11,863,000, with an estimated first Federal cost of $8,722,000 and an estimated first non-Federal cost of $3,141,000. SEC. 123. The project for St. John’s Bayou and New Madrid Floodway in the State of Missouri as authorized by subsection (d) of the matter under the heading ‘‘Lower Mississippi River’’ under section 203 of the Flood Control Act of 1954 (68 Stat. 1258) and section 401(a) of the Water Resources Development Act of 1986 (100 Stat. 4118), and as modified by section 331 of the Water Resources Development Act of 1996 (110 Stat. 3658) as described in the June 2002 Revised Supplemental Impact Statement, as supplemented by the March 2006 Revised Supplemental Environmental Impact Statement 2 for this project is economically justified: Provided, That the levee closure and gravity structure at the south end of the New Madrid Floodway portion of the Project are part of the Mississippi River Levee feature of the Mississippi River and Tributaries Project and are not a separable element of that Project. SEC. 124. Funds provided in title V, chapter 3 of Public Law 110–28 under the heading ‘‘Construction’’ may be used for restoration of shore protection projects in New Jersey damaged by the same meteorological events that resulted in Presidential Disaster Declaration FEMA–1694–DR. SEC. 125. The project for flood control, Cedar Hammock (Wares Creek), Florida, authorized by section 101(a)(10) of Public Law 104–303 (110 Stat. 3664), is modified to authorize the Secretary to construct the project at a total cost of $42,600,000.

Jkt 059194

PO 00002

Frm 00654

Fmt 6580

Sfmt 6581

M:\STATUTES\2007\59194PT2.001

APPS10

PsN: 59194PT2