Page:United States Statutes at Large Volume 122.djvu/1604

This page needs to be proofread.

12 2 STA T . 1 58 1 PUBLIC LA W 11 0– 2 4 4 —J U NE6, 2008 (4 4 )in i tem n u m b e r2316 b ys tri k in g t h e p r oj e c t d escription a nd inserting ‘ ‘ C onstruct a ne w bridge at I ndian S treet ,M artin County ’ ’

(4 5 ) in item number 242 0 by striking the project description and inserting ‘‘ P reconstruction and construction acti v ities o fU. S. 51 between the A ssumption B ypass and V anda l ia’’; (46) in item number 24 8 2 by striking ‘‘Country’’ and inserting ‘‘County’’; (4 7 ) in item number 2663 by striking the project description and inserting ‘‘ R osemead Boulevard safety enhancement and beautification, T emple City’’; (48) in item number 2671 by striking ‘‘from 2 to 5 lanes and improve alignment within rights - of-way in St. G eorge’’ and inserting ‘‘, St. George’’; (4 9 ) in item number 2743 by striking the project description and inserting ‘‘Improve safety of culvert replacement on 250th Rd. between 460th St. and Cty H wy 20 in Grandview Township, E dgar County’’; (50) by striking item number 2800; (51) in item number 2826 by striking ‘‘State Street and Cajon Boulevard’’ and inserting ‘‘Palm Avenue’’; (52) in item number 2931 by striking ‘‘ F ra z ho Road’’ and inserting ‘‘Martin Road’’; (53) in item number 3047 by inserting ‘‘and roadway improvements’’ after ‘‘safety project’’; (54) in item number 3078 by striking the project description and inserting ‘‘U.S. 2 / Sultan Basin Road improvements in Sul- tan’’; (55) in item number 3174 by striking the project description and inserting ‘‘Improving O uter Harbor access through plan- ning, design, construction, and relocations of Southtowns Con- nector –NY Route 5, Fuhrmann Boulevard, and a bridge con- necting the Outer Harbor to downtown Buffalo at the Inner Harbor’’; (56) in item number 3219 by striking ‘‘Forest’’ and inserting ‘‘ W arren’’; (57) in item number 3254 by striking the project description and inserting ‘‘Reconstruct PA Route 274/34 Corridor, Perry County’’; (58) in item number 3260 by striking ‘‘ L ake Shore D rive’’ and inserting ‘‘Lakeshore Drive and parking facility/entrance improvements serving the Museum of Science and Industry’’; (59) in item number 3368 by striking the project description and inserting ‘‘Plan, design, and engineering, Ludlam Trail, Miami’’; (60) in item number 3410 by striking the project description and inserting ‘‘Design, purchase land, and construct sound walls along the west side of I–65 from appro x imately 950 feet south of the Harding Place interchange south to Hogan Road’’; (61) in item number 3537 by inserting ‘‘and the study of alternatives along the North South Corridor,’’ after ‘‘Valley’’; (62) in item number 3582 by striking the project description and inserting ‘‘Improving Outer Harbor access through plan- ning, design, construction, and relocations of Southtowns Con- nector–NY Route 5, Fuhrmann Boulevard, and a bridge con- necting the Outer Harbor to downtown Buffalo at the Inner Harbor’’;