Page:United States Statutes at Large Volume 122.djvu/1626

This page needs to be proofread.

12 2 STA T . 1 603PUBLIC LA W 110 – 2 4 4 —J U NE 6 , 200 8(5)in i tem n u m b e r12 b ys tri k in g‘ ‘ Y uk o n R i v er ’ ’ a n d inserting ‘‘ K uskok w im River’’

( 6 ) in item number 1 8 by striking ‘‘ E ngineering and C onstru c tion in M erced County’’ and inserting ‘‘and sa f ety im p rovements / rea l ignment of S R 165 pro j ect study report and environmental studies in Merced and Stanislaus Counties’’; ( 7 ) in item number 3 8 by striking t h e project description and inserting ‘‘Relocation of the N ewark T rain Station’’; (8) in item number 57 by striking the project description and inserting ‘‘Kingsland bypass from CR 61 to I–9 5 , Camden County’’; (9) in item number 11 4 by striking ‘‘I A –32’’ and inserting ‘‘S W ’’ after ‘‘Construct’’; (1 0 ) in item number 122 by striking the project description and inserting ‘‘ D esign, right - of-way ac q uisition, and construc- tion of the SW Arterial and connections to U. S. 20, Dubuque County’’; (11) in item number 130 by striking the project description and inserting ‘‘Improvements and rehabilitation to rail and bridges on the Appanoose County Community Railroad’’; (12) in item number 133 by striking ‘‘IA–32’’; (13) in item number 138 by striking the project description and inserting ‘‘West Spencer B eltway P roject’’; (14) in item number 142 by striking ‘‘MP 9.3, Segment I, II, and III’’ and inserting ‘‘Milepost 24.3’’; (15) in item number 161 by striking ‘‘Bridge replacement on J ohnson Drive and Nall Ave.’’ and inserting ‘‘Construction improvements’’; (16) in item number 182 by striking the project description and inserting ‘‘Improve U.S. 40, M.D. 715 interchange, and other roadways in the vicinity of Aberdeen Proving G round to support BRAC-related growth’’; (17) in item number 198 by striking the project description and inserting ‘‘Construct 1 or more grade separated crossings of I–75 and make associated improvements to improve local and regional east-west mobility between Mileposts 279 and 282’’; (18) in item number 201 by striking the project description and inserting ‘‘Alger County, to reconstruct, pave, and realign a portion of H –58 from 2,600 feet south of L ittle Beaver Lake Road to 4,600 feet east of Hurricane River’’; (19) in item number 238 by striking the project description and inserting ‘‘Develop and construct the St. Mary water project road and bridge infrastructure, including a new bridge and approaches across St. Mary River, stabili z ation and improve- ments to United States Route 89, and road/canal from Siphon Bridge to Spider Lake, on the condition that $ 2,500,000 of the amount made available to carry out this item may be made available to the Bureau of Reclamation for use for the Swift Current Creek and Boulder Creek bank and bed stabiliza- tion project in the Lower St. Mary Lake drainage’’; (20) in item number 329 by inserting ‘‘, Tulsa’’ after ‘‘tech- nology’’; (21) in item number 358 by striking ‘‘fuel-celled’’ and inserting ‘‘fueled’’;