Page:United States Statutes at Large Volume 122.djvu/95

This page needs to be proofread.

12 2 STA T .7 2 PUBLIC LA W 11 0– 1 8 1 —J A N .28 , 2008 and ad escript i o no f t h e S ecretar y’ sp l an for carryin g o u t such co m plete reconstitution .‘ ‘ (6)A list of any operations plan affected b y any shortfall in the prepositioned stoc k s and a description of any action taken to mitigate any risk that such a shortfall may create. ‘‘(b) COMPTR O L L E R G E N ER A L R E VI E W . — ( 1 ) B y not later than 1 20 days after the date on w hich a report is submitted under subsection (a) , the Comptroller General shall re v iew the report and, as the Comptroller General determines appropriate, submit to the congressional defense committees any additional information that the Comptroller General determines will further inform such committees on issues relating to the status of the materiel in the prepositioned stocks. ‘‘(2) T he Secretary of D efense shall ensure the full cooperation of the Department of Defense with the Comptroller General for purposes of the conduct of the review re q uired by this subsection, both before and after each report is submitted under subsection (a). The Secretary shall conduct periodic briefings for the Comp - troller General on the information covered by each report required under subsection (a) and provide to the Comptroller General access to the data and preliminary results to be used by the Secretary in preparing each such report before the Secretary submits the report to enable the Comptroller General to conduct each review required under paragraph (1) in a timely manner. ‘‘( 3 ) The requirement to conduct a review under this subsection shall terminate on September 30, 201 5 .’’. (b) CLERI C AL AMEN D MENT.—The table of sections at the begin- ning of such chapter is amended by adding at the end the following new item

‘ 2 22 9a.An n u a lrepo r t on prepo si tione dm ateriel and e q uipment. ’ ’. SEC.35 3. R E PO R T O NI NCRE M ENT AL COST O F EARL Y20 0 7 EN H ANCE D DEPLOYMENT. Section 323(b)(2) of the J ohn W arner N ational Defense Authori z ation Act for F iscal Y ear 200 7 ( P ublic L aw 10 9– 36 4; 120 Stat. 2146; 10 U .S.C. 229 note) is amended— (1) in subparagraph (A), by striking ‘‘; and’’ and inserting a semicolon; (2) in subparagraph (B), by striking the period at the end and inserting ‘‘; and’’; and (3) by adding at the end the following new subparagraph: ‘‘(C) each of the military departments for the incre- mental changes in reset costs resulting from the deploy- ment and redeployment of forces to I raq and Afghanistan above the levels deployed to such countries on January 1, 2007.’’. SEC. 35 4 . MODIFICATION OF RE QU IREMENTS OF COMPTROLLER G EN - ERAL REPORT ON THE READINESS OF ARMY AND MARINE CORPS GROUND FORCES. (a) S UB MITTAL DATE.—Subsection (a)(1) of section 345 of the John Warner National Defense Authorization Act for Fiscal Year 2007 (Public Law 109–364; 120 Stat. 2156) is amended by striking ‘‘June 1, 2007’’ and inserting ‘‘June 1, 200 8 ’’. (b) E LEMENT S .—Subsection (b) of such section is amended— (1) by striking paragraph (2); Terminat i o n d ate .