Page:United States Statutes at Large Volume 58 Part 1.djvu/916

This page needs to be proofread.

[58 STAT. PUBLIC LAWS-H . 665 - -DEC. 22, 1944 52 stat. 1218; 5 comprehensive plan approved in the Act of June 28, 1938, as modified Stat. 6 by the Act approved August 18, 1941, for the White River Basin. UPPER MIsSIssIPPI RIVER BASIN Additional appro In addition to previous authorizations, there is hereby authorized piation authorized to be appropriated the sum of $10,000,000 for the prosecution of the 2 Stat. 1218 . comprehensive plan approved in the Act of June 28, 1938, for the dRe o ka on Upper Mississippi River Basin, including the project for theR ed Rock Dam on the Des Moines River for flood control and other purposes, substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 651, Seventy-eighth Con- gress, second session, at an estimated cost of $15,000,000. Sainte Genevieve The project authorized by the Act of June 22, 1936, for local flood Levee District No. 1, Drt No. protection on the Mississippi River at the Sainte Genevieve Levee 49 stat. 581. District Numbered 1, Missouri, is hereby modified substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 727, Seventy-seventh Congress, second session, at an estimated cost of $141,000. Des Moines, Iowa. The project on the Des Moines River for local flood protection of Des Moines, Iowa, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Doc- ument Numbered 651, Seventy-eighth Congress, second session, at an estimated cost of $270,000. abula, Iow. The project on the Mississippi River for local flood protection at Sabula, Iowa, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 328, Seventy-seventh Congress, first session, at an estimated cost of $25,000. oaenam The project on the Galena River, for local flood protection at Galena, Illinois, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 336, Seventy-seventh Congress, first session, at an estimated cost of $418,000. llinois River. The project for flood control on the Illinois River is hereby author- ized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 692, Seventy- seventh Congress, second session, at an estimated cost of $111,500. Farm reek, Iu. The project for flood control on Farm Creek, Illinois, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 802, Seventy- eighth Congress, second session, at an estimated cost of $3,017,900. Elkport Iowa. The project on Elk Creek and Turkey River for local flood pro- tection at Elkport, Iowa, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 700, Seventy-seventh Congress, second session, at an estimated cost of $13,000. RED RIVER OF THE Norm BASIN Red Lake and The projects for flood control for Red Lake River, Minnesota, Clearwater River, Minnesota, are hereby authorized sub- stantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 345, Seventy-eighth Con- gress, first session, at an estimated cost of $902,940. heyenne River, N. The project for the Bald Hill Reservoir on the Sheyenne River for D ldHimeoir. flood control and other purposes in the Sheyenne River Basin, North Dakota, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document 896