Page:United States Statutes at Large Volume 76.djvu/1231

This page needs to be proofread.
[76 Stat. 1183]
PUBLIC LAW 87-000—MMMM. DD, 1962
[76 Stat. 1183]

76 STAT.]

PUBLIC LAW 87-874-OCT. 23, 1962

1183

and subsequent Acts of Congress, is hereby modified to include the following items: The project for flood protection of West Palm Beach Canal is hereby authorized substantially as recommended by the Secretary of the Army and the Chief of Engineers in Senate Document Numbered 146, Eighty-seventh Congress, at an estimated cost of $3,220,000. The project for flood protection on Boggy Creek, Florida, is hereby authorized substantially as recommended by the Chief of Engineers in Senate Document Numbered 125, Eighty-seventh Congress, at an estimated cost of $1,176,000. The project for South Dade County, Florida, is hereby authorized substantially in accordance with the recommendations of the Secretary of the Army and the Chief of Engineers in Senate Document Numbered 138, Eighty-seventh Congress, at an estimated cost of $13,388,000. The project for Shingle Creek, Florida, between Clear Lake and Lake Tohopekaliga, for flood control and major drainage is hereby authorized substantially as recommended by the Chief of Engineers in Senate Document Numbered 139, Eighty-seventh Congress, at an estimated cost of $3,250,000: Provided, That no obligation shall be incurred for development of the Reedy Creek Swamp as a wildlife management area unless the State or one or more other non-Federal entities shall have entered into an agreement in advance to assume at least 50 per centum of the cost associated with that feature of the project. The project for flood protection in the Cutler drain area, Florida, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 123, Eighty-seventh Congress, at an estimated cost of $2,063,000: Provided., That local interests shall receive credit in the Contributed Fund Account of the project for moneys shown to have been spent after March 1, 1960, for construction of units of the authorized plan for Cutler Drain: Provided further.^ That such completed work must be inspected and accepted by the Chief of Engineers as constituting useful parts of the authorized plan: And provided further. That the credit established shall be in accordance with cost sharing arrangements for the central and southern Florida flood control project in an amount not to exceed $124,000. GREEN S W A M P REGION, FLORIDA

The project for the Four River Basins, Florida, namely the Hillsborough, Oklawaha, Withlacoochee, and Peace Rivers, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 585, Eightyseventh Congress, at an estimated cost of $57,760,000: Provided., That the cost sharing shall be as recommended by the Secretary of the Army in House Document Numbered 585, Eighty-seventh Congress: And provided further., That planning and construction on the LoweryMattie Conservation Area and its appurtenant works is deferred until additional studies are made thereon, and a further report submitted to the Congress. PASCAGOULA RIVER BASIN

The project for flood protection on the Chunky Creek, Chickasawhay and Pascagoula Rivers, Mississippi, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 549, Eighty-seventh Congress, at an estimated cost of $6,740,000.

Lowery-Mattie Conservation Area. Additional stud-