T R U C K E E RIVER BASIN

The project for flood protection on the Truckee River and tributaries, California and Nevada, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 435, Eighty-seventh Congress, at an estimated cost of $2,385,000. SAN FRANCISCO BAY AREA

The project for flood protection on Alameda Creek, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 128, Eighty-seventh Congress, at an estimated cost of $14,680,000. The project for Corte Madera Creek, Marin County, California, is hereby authorized substantially in accordance with the recommendations of the Secretary of the Army and the Chief of Engineers in House Document Numbered 545, Eighty-seventh Congress, at an estimated cost of $5,534,000: Provided, That local interests shall contribute in cash 3 per centum of the Federal construction of the Rose Valley unit with a contribution presently estimated at $158,000. SAN J O A Q U I N RIVER B A S I N

The New Melones project, Stanislaus River, California, authorized by the Flood Control Act approved December 22, 1944 (58 Stat. 887), ss Stat. 901. is hereby modified substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 453, Eighty-seventh Congress, at an estimated cost of $113,717,000: Prodded^ That upon completion of construction of the dam and powerplant by the Corps of Engineers, the project shall become an integral part of the Central Valley project and be operated and maintained by the Secretary of the Interior pursuant to the Federal reclamation laws, except that the flood control operation of the project shall be in accordance with the rules and regulations prescribed by the Secretary of the Army: Provided further, That the Stanislaus River Channel, from Goodwin Dam to the San Joaquin River, shall be maintained by the Secretary of the Army to a capacity of at least eight thousand cubic feet per second subject to the condition that responsible local interests agree to maintain private levees and to prevent encroachment on the existing channel and floodway between the levees: Provided further, That before initiating any diversions of water from the Stanislaus River Basin in connection with the operation of the (^entral Valley project, the Secretary of the Interior shall determine the quantity of water required to satisfy all existing and anticipated future needs within that basin and the diversions shall at all times be subordinate to the quantities so determined: Provided further, That the Secretary of the Army adopt appropriate Fish and wiiameasures to insure the preservation and propagation of fish and wild- "^® preservation. life in the New Melones project and shall allocate to the preservation and propagation of fish and wildlife, as provided in the Act of August 14, 1946 (60 Stat. 1080), an appropriate share of the cost of construct- le use 66Iing the Stanislaus River diversion and of operating and maintaining ^^^'=the same: Provided fv/rther^ That the Secretary of the Army, in connection with the New Melones project, construct basic public recreation facilities, acquire land necessary for that purpose, the cost of constructing such facilities and acquiring such lands to be nonreimbursable and nonreturnable: Provided further, That contracts for the sale and delivery of the additional electric energy available from the Central Valley project power system as a result of the con-