Page:United States Statutes at Large Volume 79.djvu/1141

This page needs to be proofread.

[79 STAT. 1101]
PUBLIC LAW 89-000—MMMM. DD, 1965
[79 STAT. 1101]

79 STAT. ]

PUBLIC LAW 89-299-OCT. 28, 1965 CONSTRUCTION A N D

REHABILITATION

For construction and rehabilitation of authorized reclamation projects or parts thereof (including power transmission facilities) and for other related activities, as authorized by law, to remain available until expended, $196,661,500 of which $90,000,000 shall be derived from the reclamation fund: Provided, That no part of this appropriation shall be used to initiate the construction of transmission facilities within those areas covered by power wheeling service contracts which include provision for service to Federal establishments and preferred customers, except those transmission facilities for which construction funds have been heretofore appropriated, those facilities which are necessary to carry out the terms of such contracts or those facilities for which the Secretary of the Interior finds the wheeling agency is unable or unwilling to provide for the integration of Federal projects or for service to a Federal establishment or preferred customer: Provided further, That the final point of discharge for the interceptor drain for the San Luis unit shall not he determined until (1) completion of a pollution study by the Department of Health, Education, and Welfare, (2) development of a plan to minimize any detrimental effect of the San Luis drainage waters on San Francisco Bay, and (3) agreement is reached by the Secretary with the State of California, subject to the approval of the President, limiting the Federal share of the costs of the drain to Antioch to not more than 60 per centum thereof, and if found necessary to extend the drain beyond Antioch, the Federal share of such extension shall be determined on the basis of an equitable apportionment of the additional costs between the Federal Government and the non-Federal entities who are to use the facilities: Provided further, That no funds shall be made available under this appropriation for the construction in Contra Costa County, California, of any portion of the interceptor drain in connection with the San Luis unit which terminates at any point east of Port Chicago: Provided further, That not to exceed $2,200,000 shall be available for construction of additional facilities associated with delivery of Colorado River water to Mexico, and to be nonreimbursable: Provided further, That not to exceed $450,000 shall be available for replacement of the Paradise Valley Diverson Dam on the Milk River project, Montana, with facilities to serve the lands of the Paradise Valley Irrigation District, to be repaid in full under terms and conditions satisfactory to the Secretary of the Interior. OPERATION AND

1101

MAINTENANCE

For operation and maintenance of reclamation projects or parts thereof and other facilities, as authorized by law; and for a soil and moisture conservation program on lands under the jurisdiction of the Bureau of Reclamation, pursuant to law, $41,305,000, of which $29,547,000 shall be derived from the reclamation fund and $1,629,000 ^hall be derived from the Colorado River Dam fund: Provided, That funds advanced by water users for operation and maintenance of reclamation projects or parts thereof shall be deposited to the credit of this appropriation and may be expended for the same objects and

San L u i s unit.

Federal share of c o s t s, limitation.