Page:United States Statutes at Large Volume 79.djvu/656

This page needs to be proofread.

[79 STAT. 616]
PUBLIC LAW 89-000—MMMM. DD, 1965
[79 STAT. 616]

616

PUBLIC LAW 89-161-SEPT. 2, 1965

[79 STAT.

interconnection with the Central Valley project power system: Provided, That provision may be made for the ultimate development of the hydroelectric capacity (now estimated at approximately four hundred thousand kilowatts) and such installation may be made when duly authorized by an Act of Congress: Provided further, That no facilities, except those required for interconnecting the Auburn powerplant and the Folsom switchyard and those interconnecting the Folsom switchyard and the Elverta substation, shall be constructed for electric transmission or distribution service which the Secretary determines, on the basis of a firm offer of a fifty-year contract from a local public or private agency, can be obtained at less cost to the Federal Government than by construction and operation of Government facilities; (3) the Sugar Pine Dam and Reservoir; (4) the Comity Line Dam and Reservoir; (5) necessary diversion works, conduits, and other appurtenant works for the delivery of water supplies to projects on the Forest Hill Divide in Placer County and in the Folsom-Malby area in Sacramento and E l Dorado Counties; (6) the Folsom South canal and cuch related structures, including pumping plants, regulating reservoirs, floodways, channels, levees, and other appurtenant works for the delivery of water as the Secretary determines will best serve the needs of Sacramrnto and San Joaquin Counties: Provided, That the Secretary is authorized to include in such canal and related operating structures such additional works or capacity as he deems necessary and economically justified to provide for the future construction of the East Siae division of the Central Valley project, and the incremental costs of providing additional works or capacity in the Folsom South canal to serve the East Side division of the Central Valley project shall be assigned to deferred use for repayment from Central Valley project revenues. I n the event that the East Side division is authorized, such costs shall be deemed a part of the cost of that division and shall be reallocated as the Secretary deems right and proper. ^ j^oject coordina- gj;c. 2. Subject to the provisions of this Act, the operation of the °"* Auburn-Folsom South unit, American River division, shall be integrated and coordinated, from both a financial and an operational standpoint, with the operation of other features of the Central Valley project, as presently authorized and as may in the future be authorized by Act of Congress, in such manner as will effectuate the fullest, most beneficial, and most economic utilization of the water resources hereby Flood control. made available. Aubivrn and County Line Dams shall be operated for flood control in accordance with criteria established by the Secretary of the Army as provided for in section 7 of the Flood Control Act of 1944 (58 Stat. 887; 33 U.S.C. 709). tio°nw°firhand" ^^^' ^- (a),Subject to the provisions of subsections (b), (c), (d), wildlife facilities, and (c) of this section, the Secretary is authorized in connection with the Auburn-Folsom South unit (i) to construct, operate, and maintain or provide for the construction, operation, and maintenance of public outdoor recreation and fish and wildlife enhancement facilities, (ii) to acquire or otherwise to include within the unit area such adjacent lands or interests in land as are necessary for present or future public recreation or fish and wildlife use, (iii) to allocate water and reservoir capacity to recreation and fish and wildlife enhancement, and (iv) to provide for the public use and enjoyment of unit lands, facilities, and water areas in a manner coordinated with other unit purposes. The Secretary is further authorized to enter into agreements with Federal