Page:United States Statutes at Large Volume 82.djvu/783

This page needs to be proofread.

[82 STAT. 741]
PUBLIC LAW 90-000—MMMM. DD, 1968
[82 STAT. 741]

82 STAT. ]

PUBLIC LAW 90-483-AUG. 13, 1968

741

ment Numbered 101, Ninetieth Congress, at an estimated cost of $8,072,000, and in accordance with House Document Numbered 369, Ninetieth Congre^, at an estimated cost of $58,182,000. PASCAGOULA RIVER B A S I N

The project for the Tallahala Creek Dam and Reservoir, Tallahala Creek, Mississippi, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 143, Ninetieth Congress, at an estimated cost of $16,360,000. LOWER M I S S I S S I P P I RIVER

BASIN

The project for flood control and improvement of the lower Mississippi River, adopted by the Act of May 15, 1928 (45 Stat. 534), as amended and modified, is hereby further modified and expanded to include the following items: (1) The project for the St. Francis River Basin, Arkansas and Missouri, authorized by the Flood Control Act approved June 15, 1936 (Public Law 74-678), as modified by subsequent Acts of Congress, including the Flood Control Act of 1965. Public Law 89-298 is hereby further modified to provide that the requirements of local cooperation for the improvements authorized in the Flood Control Act of 1965, shall conform to those requirements for local cooperation in the Saint Francis River Basin authorized in previous Acts of Congress, substantially as recommended by the Chief of Engineers in Senate Document Numbered 11, Ninetieth Congress. (2) Improvements in the Boeuf and Tensas Rivers and Bayou Macon Basin to divert flows that would otherwise enter Lake Chicot, Arkansas, substantially in accordance with the recommendations of the Chief of Engineers in House Docmnent Numbered 168, Ninetieth Congress, at an estimated cost of $15,240,000, except that prior to initiation of construction of the project, local interests shall agree that no fees shall be charged for admission to Lake Chicot and to public recreation areas adjoining Lake Chicot and that user fees at such lake and areas shall be devoted to recreation purposes. (3) Improvements in the Belle Fountain ditch and tributaries, Missouri, and Drainage District Number 17, Arkansas, substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 339, Ninetieth Congress, at an estimated cost of $4,638,000. W H I T E RIVER

BASIN

The project for flood protection on Crooked Creek at and in the vicinity of Harrison, Arkansas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Seriate Document Numbered 28, Ninetieth Congress, at an estimated cost of $2,840,000. BRAZOS RIVER

BASIN

The project for the Aquilla Dam and Reservoir, Aquilla Creek, Texas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Nmnbered 52, Ninetieth Congress, at an estimated cost of $23,612,000. NAVASOTA RIVER B A S I N

The project for the Navasota River, Texas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 341, Ninetieth Congress, at an estimated cost of $119,707,000.

Project modification. 33 USC 702a702m.

^9 Stat. isos^9 Stat. lora.