Page:United States Statutes at Large Volume 88 Part 1.djvu/56

This page needs to be proofread.

PUBLIC LAW 93-000—MMMM. DD, 1975

12

PUBLIC LAW 93-251-MAR. 7, 1974

[88 STAT.

Public Law 93-251 March 7, 1974 [H. R. 10203]

Water r e s o u r c e s development; river b a s i n monetary authorizations. Water R e s o u r c e s Development Act of 1974.

AN ACT Authorizing the construction, repair, and preservation of certain public works on rivers and harbors for navigation,floodcontrol, and for other purposes. Be it enacted by the Senate and House of Representatives United States of America in Congress assembled,

of the

TITLE I—WATEK EESOURCES DEVELOPMENT SEC. 1. (a) The Secretary of the Army, acting through the Chief of Engineer's, is hereby authorized to undertake the phase I design memorandum stage of advanced engineering and design of the following multi-purpose water resources development projects, substantially in accordance with, and subject to the conditions recommended by the Chief of Engineers in, the reports hereinafter designated. MIDDLE A T L A N T I C

COASTAL AREA

The project for hurricane-flood protection at Virginia Beach, Virginia: House Document Numbered 92-365, at an estimated cost of $954,000. J A M E S RIVER B A S I N

The project for flood protection for the city of Buena Vista on the Maury River, Virginia: House Document Numbered 93-56, at an estimated cost of $665,000. SALT RIVER

BASIN

The project for Camp Ground Lake on Beech Fork in the Salt River Basin, Kentucky, for flood protection and other purposes: House Document Numbered 92-374, at an estimated cost of $330,000. PASCAGOULA RIVER

BASIN

The project for flood protection and other purposes on Bowie Creek, Mississippi: House Document Numbered 92-359, at an estimated cost of $390,000. PEARL RIVER

BASIN

The project for flood control and other purposes on the Pearl River, Mississippi: House Document Numbered 92-282, at an estimated cost of $310,000. U P P E R M I S S I S S I P P I RIVER

BASIN

The project for flood control and other purposes on the Zumbro River at Rochester, Minnesota: Report of the Chief of Engineers dated June 7, 1973, in House Document Numbered 93-156, at an estimated cost of $150,000. LOWER M I S S I S S I P P I RIVER

BASIN

The project for Greenville Harbor, Greenville, Mississippi: Senate Document Numbered 93-38, at an estimated cost of $200,000, The project for flood protection for the east bank of the Mississippi River, Warren to Wilkinson Counties, Mississippi (Natchez area): House Document Numbered 93-148, at an estimated cost of $150,000. The project for flood control and other purposes on the east bank of the Mississippi River, Warren to Wilkinson Counties, Mississippi