Page:United States Statutes at Large Volume 91.djvu/528

This page needs to be proofread.

PUBLIC LAW 95-000—MMMM. DD, 1977

91 STAT. 494

Regulations.

Permit review.

Steep-slope surface coal mining.

'Steep slope."

Original contour restoration, requirements variances.

PUBLIC LAW 95-87—AUG. 3, 1977 (C) the resulting plateau or rolling contour drains inward from the outslopcs except at specified points; (D) no damage will be done to natural watercourses; (E) spoil will be placed on the mountaintop bench as is necessary to achiev^e the planned postmining land use: Provided, That all excess spoil material not retained on the mountaintop shall be placed in accordance with the provisions of subsection (b) (22) of this section; (F) insure stability of the spoil retained on the mountaintop and meet the other requirements of this Act; (5) The regulatory authority shall promulgate specific regulations to govern the granting of permits in accord with the provisions of this subsection, and may impose such additional requirements as he deems to be necessary. (6) All permits granted under the provisions of this subsection shall be reviewed not more than three years from the date of issuance of the permit, unless the applicant affirmatively demonstrates that the proposed development is proceeding in accordance with the terms of the approved schedule and reclamation plan. (d) The following performance standards shall be applicable to steep-slope surface coal mining and shall be in addition to those general performance standards required by this section: Provided, however, That the provisions of this subsection (d) shall not apply to those situations in which an operator is mining on flat or gently rolling terrain, on which an occasional steep slope is encountered through which the mining operation is to proceed, leaving a plain or predominantly flat area or where an operator is in compliance with provisions of subsection (c) hereof: (1) Insure that when performing surface coal mining on steep slopes, no debris, abandoned or disabled equipment, spoil material, or waste mineral matter be placed on the downslope below the bench or mining cut: Provided, That spoil material in excess of that required for the reconstruction of the approximate original contour under the provisions of paragraph 515 (b)(3) or 515(d)(2) shall be permanently stored pursuant to section 515(b) (22). (2) Complete backfilling with spoil material shall be required to cover completely the highwall and return the site to the appropriate original contour, which material will maintain stability following mining and reclamation. (3) The operator may not disturb land above the top of the highwall unless the regulatory authority finds that such disturbance will facilitate compliance with the environmental protection standards of this section: Provided, however, That the land disturbed above the highwall shall be limited to that amount necessary to facilitate said compliance. (4) For the purposes of this subsection (d), the term "steep slope" is any slope above twenty degrees or such lesser slope'as may be defined by the regulatory authority^ after consideration of soil, climate, and other characteristics of a region or State. (e)(1) Each State program may and each Federal program shall include procedures pursuant to which the regulatory authority may permit variances for the purposes set forth in paragraph (3) of this subsection, provided that the watershed control of the area is improved; and further provided complete backfilling with spoil material shall be required to cover completely the highwall which material will maintain stability following mining and reclamation.