Page:United States Statutes at Large Volume 92 Part 1.djvu/693

This page needs to be proofread.

PUBLIC LAW 95-000—MMMM. DD, 1978

PUBLIC LAW 95-372—SEPT. 18, 1978 section 21(b) of this Act) assuring maximum environmental protection by utilization of the best available and safest technologies, including the safest practices for pipeline burial and upon the express condition that oil or gas pipelines shall transport or purchase without discrimination, oil or natural gas produced from submerged lands or outer Continental Shelf lands in the vicinity of the pipelines in such proportionate amounts as the Federal Energy Regulatory Commission, in consultation with the Secretary of Energy, may, after a full hearing with due notice thereof to the interested parties, determine to be reasonable, taking into account, among other things, conservation and the prevention of waste. Failure to comply with the provisions of this section or the regulations and conditions prescribed under this section shall be ground for forfeiture of the grant in an appropriate judicial proceeding instituted by the United States in any United States district court having jurisdiction under the provisions of this Act. "(f)(1) Except as provided in paragraph (2), every permit, license, easement, right-of-way, or other grant of authority for the transportation by pipeline on or across the outer Continental Shelf of oil or gas shall require that the pipeline be operated in accordance with the following competitive principles: "(A) The pipeline must provide open and nondiscriminatory access to both owner and nonowner shippers. "(B) Upon the specific request of one or more owner or nonowner shippers able to provide a guaranteed level of throughput, and on the condition that the shipper or shippers requesting such expansion shall be responsible for bearing their proportionate share of the costs and risks related thereto, the Federal Energy Regulatory Commission may, upon finding, after a full hearing with due notice thereof to the interested parties, that such expansion is within technological limits and economic feasibility, order a subsequent expansion of throughput capacity of any pipeline for which the permit, license, easement, right-of-way, or other grant of authority is approved or issued after the date of enactment of this subparagraph. This subparapragh shall not apply to any such grant of authority approved or issued for the Gulf of Mexico or the Santa Barbara Channel. " (2) The Federal Energy'^ Regulatory Commission may, by order or regulation, exempt from any or all of the requirements of paragraph (1) of this subsection any pipeline or class of pipelines which feeds into a facility where oil and gas are first collected or a facility where oil and gas are first separated, dehydrated, or otherwise processed. "(3) The Secretary of Energy and the Federal Energy Regulatory Commission shall consult with and give due consideration to the views of the Attorney General on specific conditions to be included in any permit, license, easement, right-of-way, or grant of authority in order to ensure that pipelines are operated in accordance with the competitive principles set forth in paragraph (1) of this subsection. In preparing any such views, the Attorney General shall consult with the Federal Trade Commission. "(4) Nothing in this subsection shall be deemed to limit, abridge, or modify any authority of the United States under any other provision of law with respect to pipelines on or across the outer Continental Shelf. "(g)(1) The leasee shall produce any oil or gas, or both, obtained pursuant to an approved development and production plan, at rates

92 STAT. 639 Post, p. 654.

Forfeiture of grant.

Notice and hearing.

Regulations.

Attorney General, consultation.

Federal Trade Commission, consultation.

Presidential rule or order.