Page:NATIONAL INTELLIGENCE SURVEY 18; CZECHOSLOVAKIA; TRANSPORTATION AND TELECOMMUNICATIONS CIA-RDP01-00707R000200110013-9.pdf/22

This page has been proofread, but needs to be validated.

APPROVED FOR RELEASE: 2009/06/16: CIA-RDP01-00707R000200110013-9


FIGURE 9. Selected inland waterway routes (S) (Continued)
Location and Length Physical Characteristics Operations Remarks
Czechoslovakia/Hungary border-Czechoslovakia/Austrian border; 106.5 route miles via Danube. Partially regulated stream; channel width, 205 ft.; safe draft, 8.2 ft.; current velocity slight to moderate; 3 bridges; high water 1 May-1 June; low water mid-July-mid-Aug; total water level differential, 15 ft. No locks. Navigation season 1 Feb-early Jan. Ice mid-Dec-mid-Feb can interrupt traffic for 35 days. Icebreakers/tugs attempt to keep channels open. Low water July, Aug may require light loading and can create delays; morning and evening fog in spring and fall may curtail operating day. Normal operating day, 24 hours; 2-way channel operations, separate upstream and downstream channels around large islands. Common carriers: 800-ton-1,500-ton self-propelled barges and pusher trains of 2,000-h.p. towboat with two 1,500-ton barges. River-seagoing vessels up to 2,500 d.w.t. can be accommodated. Principal cargos: coal, ore, petroleum, petroleum products, manufactures. Strategically important for E-W movement of Warsaw Pact forces. Supplies bulk materials and semi-finished products to Czech industries and carries heavy manufactures to lower Danube river-maritime ports for export. Principal ports: Komarno, Bratislava.


16


APPROVED FOR RELEASE: 2009/06/16: CIA-RDP01-00707R000200110013-9