Page:The Working and Management of an English Railway.djvu/95

This page has been validated.
SIGNALS AND INTERLOCKING.
81

signals would stretch from Liverpool to New York. The largest interlocking apparatus ever constructed in the Crewe works is that at the South Junction cabin at Rugby, which contains no less than 180 levers.

The maintenance of all this complicated array of signals and interlocking apparatus, over upwards of 1,800 miles of railway, is in itself a work of great magnitude, and one requiring the closest and most anxious attention, having regard to the consequences that might result from a single point rod breaking or getting out of gear; or from a single signal arm failing to respond to the action of the lever. For the purposes of maintenance, the entire system is divided into eleven districts, each of which is in charge of an inspector, these eleven inspectors being assisted by twenty-one sub-inspectors and foremen, and having under their orders sixty-eight chargemen and 430 workmen. The districts are sub-divided into lengths, and each length is placed in charge of a "chargeman" and an assistant, who visit every signal cabin on their length once a fortnight, clean and oil the fittings of each signal and point, execute any small repairs or renewals that may be required, and which it is possible to carry out during their visit, and report to the inspector of the district any repairs or renewals which they may find to be necessary, but which they are unable to deal with upon the spot. In every signal cabin the name and private address of the chargeman who is responsible for it is posted, and it is the duty of the signalman to report to him every failure or defect that may become apparent during the intervals of his visits, sending at the same time a duplicate of the report to the inspector of the district.

In addition to this, every cabin is visited once a month