PUBLIC LAW 100-000—MMMM. DD, 1988

PUBLIC LAW 1 0 0 - 6 7 6 - N O V. 17, 1988 Sec. Sec Sec. Sec Sec Sec Sec. Sec Sec

102 STAT. 4013

46. Kiammmee River, Florida. 47. Water resources studies. 48. Division laboratory. 49. Water resources management planning service for the Hudson River Basin. 50. Technical resource service. Red River Basin, Minnesota and North Dakota. 51. Correction of descriptions. 52. Project deauthorizations. 53. Namings. 54. Declaration of nonnavigability of bodies of water in lUdgefield, New Jersey.

SEC 2. SECRETARY DEFINED.

For purposes of this Act, the term "Secretary" means the Secretary of the Army. SEC. 3. PROJECT AUTHORIZATIONS. (a) AUTHORIZATION OF CONSTRUCTION.—Ebccept as otherwise pro-

vided in this subsection, the following projects for water resources development and conservation and other purposes are authorized to be carried out by the Secretary substantially in accordance with the plans and subject to the conditions recommended in the respective reports designated in this subsection: (1) LOWER MISSION CREEK, SANTA BARBARA, CALIFORNIA.—The

project for flood control. Lower Mission Creek, Santa Barbara, CaUfomia: Report of the Chief of Engineers, dated March 25, 1988, at a total cost of $10,420,000, with an estimated fu^t Federal cost of $5,909,000, and an estimated first non-Federal cost of $4,511,000. (2) FT. FIERCE HARBOR, FLORIDA.—The project for navigation. Ft. Pierce Harbor, Florida: Report of the Chief of Engineers, dated December 14. 1987, at a total cost of $6,742,000, with an estimated first Federal cost of $4,319,000, and an estimated first non-Federal cost of $2,423,000. (3) NASSAU COUNTY, FLORIDA.—The project for beach erosion control, Nassau County (Amelia Island), Florida: Report of the Chief of EIngineers, dated May 19, 1986, at a total cost of $5,753,000, with an estimated first Federal cost of $4,619,000, and an estimated first non-Federal cost of $1,134,000. (4) PORT SUTTON CHANNEL, FLORIDA.—The project for naviga-

tion. Port Sutton Channel, Florida: Report of the Chief of E n ^ e e r s, dated March 28, 1988, at a total cost of $2,670,000, witii an estimated first Federal cost of $1,155,000, and an estimated first non-Federal cost of $1,515,000; except that construction of such project may not be initiated until the Secretary determines that such project serves more than one beneficiary. (5) CmCAGOLAND UNDERFLOW PLAN, ILLINOIS.—The project

for flood control, Chicagoland Underflow Plan, Illinois: Report of the Chief of Engineers, dated March 25, 1988, at a total cost of $419,000,000, with an estimated first Federal cost of $314,250,000, and an estimated first non-Federal cost of $104,750,000. (6) LOWER omo RIVER, ILLINOIS AND KENTUCKY.—The project

for navigation. Lower Ohio River, Locks and Dams 52 and 53. Illinois and Kentucky: Report of the Chief of Engineers, dated August 20, 1986. at a total cost of $775,000,000, with a first Federal cost of $775,000,000, and with tile costs of construction of the project to be paid one-half from amounts appropriated from the general fund of the Treasury and one-half from amounts appropriated from the Inland Waterways Trust Fund.

33 USC 2201