Page:United States Statutes at Large Volume 105 Part 2.djvu/610

This page needs to be proofread.

105 STAT. 1562 PUBLIC LAW 102-190—DEC. 5, 1991 10 USC 2802 SEC. 2868. REPORTS RELATING TO MILITARY CONSTRUCTION FOR note. FACILITIES SUPPORTING NEW WEAPON SYSTEMS. (a) REQUIREMENT.—The Secretary of Defense shall submit to Congress with the budget submitted under section 1105 of title 31, United States Code, for the fiscal year in which the first construction of a facility for the permanent basing of a new weapon system is to be authorized a report describing— (1) the site or sites selected or planned for permanent basing of the planned force of that weapon system; (2) the rationale for selecting such site or sites; and (3) the military construction activities proposed for each such site. 0?) NEW WEAPON SYSTEM DEFINED. — For purposes of this section, the term "new weapon system" means any military aircrsrft or major naval combatant vessel for which a complete permanent basing plan has not been publicly announced before the date of the enactment of this Act. SEC. 2869. INITIATION OF CONSTRUCTION OF PHOENIX, ARIZONA, AND VICINITY (STAGE 2) FLOOD CONTROL. (a) IN GENERAL. —With funds appropriated for fiscal year 1992 by the Energy and Water Development Appropriations Act, 1992 (Public Law 102-104) for construction water projects, the Secretary of the Army is directed, with respect to the Phoenix, Arizona, and vicinity (Stage 2) flood control project, to initiate construction to cover the Arizona Canal Diversion Channel— (1) for approximately 150 linear feet east of Central Avenue in Phoenix; (2) for 1,760 feet west from 32nd Street to the property line of the Arizona Biltmore in Phoenix; and (3) from 1,250 east of 32nd Street to the Cudia City Wash Spillway in Paradise Valley. (b) COST SHARING.— The Federal share of the cost of construction under subsection (a) shall be 90 percent, and the non-Federal share of such cost shall be provided by the city of Phoenix and the town of Paradise Valley, Arizona, for the portions of such construction which are in such city and town, respectively. (c) EXPEDITED CONSTRUCTION. — The Secretary is directed to take all appropriate steps to expedite construction under subsection (a). (d) TERMS AND CONDITIONS.— Except as provided in subsection (b), the construction under subsection (a) shall be carried out under the terms and conditions set forth in the agreement dated July 21, 1977, and executed in accordance with section 221 of the Flood Control Act of 1970 (Public Law 91-611) between the Maricopa County Flood Control District and the Secretary of the Army with respect to the project referred to in subsection (a). (e) TERMINATION OF AUTHORITY.— The authorization in this section shall expire on September 30, 1993. SEC. 2870. TECHNICAL AMENDMENTS. Title 10, United States Code, is amended as follows: (1) Section 2676(d) is amended in the second sentence— (A) by striking out "(1)"; and i (B) by striking out ", or (2)" and all that follows through "increased cost'. (2) Section 2803(b) is amended in the third sentence by striking out ", or after" and all that follows "that period".