Page:United States Statutes at Large Volume 108 Part 4.djvu/446

This page needs to be proofread.

108 STAT. 3080 PUBLIC LAW 103-337—OCT. 5, 1994 ized to be appropriated in subsections (a), (b)(2), (c)(2), (d), (e), (f), and (g)(2) reduced by the sum of— (1) $249,300,000, for use of prior year balances; and (2) $17,500,000, for savings resulting from procurement reform. SEC. 3103. NUCLEAR MATERIALS SUPPORT AND OTHER DEFENSE PRO- GRAMS. (a) MATERIALS SUPPORT.— Subject to subsection (d), funds are hereby authorized to be appropriated to the Department of Energy for fiscal year 1995 for materials support in carrying out nuclear materials support necessary for national security programs in the amount of $902,255,000, to be allocated as follows: (1) For reactor operations, $163,634,000. (2) For processing of nuclear materials, $410,468,000. (3) For support services, $167,776,000. (4) For capital equipment, $39,427,000. (5) For plant projects (including maintenance, restoration, planning, construction, acquisition, modification of facilities, and the continuation of projects authorized in prior years, and land acquisition related thereto), $64,950,000, to be allocated as follows: Project GPD-146, general plant projects, various locations, $15,000,000. Project 95-D -155, upgrade site road infrastructure, Savannah River, South Carolina, $750,000. Project 95-D-156, radio trunking system. Savannah River, South Carolina, $2,100,000. Project 95-D-157, D-area powerhouse life extension. Savannah River, South Carolina, $4,000,000. Project 95-D-158, disassembly basin upgrades K, L, and P, Savannah River, South Carolina, $13,000,000. Project 93-D-147, domestic water system upgrade. Phases I and II, Savannah River, South Carolina, $11,300,000. Project 93-D-148, replace high-level drain lines. Savannah River, South Carolina, $2,700,000. Project 93-D-152, environmental modification for production facilities. Savannah River, South Carolina, $2,900,000. Project 92-D-143, health protection instrument calibration facility. Savannah River, South Carolina, $3,000,000. Project 90-D-149, plantwide fire protection. Phases I and II, Savannah River, South Carolina, $5,000,000. Project 92-D -150, operations support facilities. Savannah River, South Carolina, $2,000,000. Project 92-D -153, engineering support facility. Savannah River, South Carolina, $3,200,000. (6) For program direction, $56,000,000. (b) OTHER DEFENSE PROGRAMS.—Subject to subsection (d), funds are hereby authorized to be appropriated to the Department of Energy for fiscal year 1995 for other defense programs in carrying out defense programs necessary for national security programs in the amoiuit of $669,657,000, to be allocated as follows: (1) For verification and control technology, $348,555,000, to be allocated as follows: