Page:United States Statutes at Large Volume 117.djvu/1849

This page needs to be proofread.

[117 STAT. 1830]
PUBLIC LAW 107-000—MMMM. DD, 2003
[117 STAT. 1830]

117 STAT. 1830

PUBLIC LAW 108–137—DEC. 1, 2003

connections to the existing system at Kake, Alaska: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to proceed with the construction of the Wrangell Harbor, Alaska, project in accordance with the Chief of Engineer’s report dated December 23, 1999: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $33,400,000 of the funds appropriated herein for the Clover Fork, City of Cumberland, Town of Martin, Pike County (including Levisa Fork and Tug Fork Tributaries), Bell County, Harlan County in accordance with the Draft Detailed Project Report dated January 2002, Floyd County, Martin County, Johnson County, and Knox County, Kentucky, detailed project report, elements of the Levisa and Tug Forks of the Big Sandy River and Upper Cumberland River: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use funds appropriated for the navigation project, Tampa Harbor, Florida, to carry out, as part of the project, construction of passing lanes in an area approximately 3.5 miles long, centered on Tampa Bay Cut B, if the Secretary determines that such construction is technically sound, environmentally acceptable, and cost effective: Provided further, That using $200,000 appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, may develop an environmental impact statement for introducing non-native oyster species into the Chesapeake Bay: Provided further, That during preparation of the environmental impact statement, the Secretary may establish a scientific advisory body consisting of the Virginia Institute of Marine Science, the University of Maryland, and other appropriate research institutions to review the sufficiency of the environmental impact statement: Provided further, That in addition, the Secretary shall give consideration to the findings and recommendations of the National Academy of Sciences report on the introduction of non-native oyster species into the Chesapeake Bay in the preparation of the environmental impact statement: Provided further, That notwithstanding the cost sharing provisions of section 510(d) of the Water Resources Development Act of 1996 (110 Stat. 3760), the preparation of the environmental impact statement shall be cost shared 50 percent Federal and 50 percent non-Federal, for an estimated cost of $2,000,000: Provided further, That the non-Federal sponsors may meet their 50 percent matching cost share through in-kind services: Provided further, That the Secretary determines that work performed by the non-Federal sponsors is reasonable, allowable, allocable, and integral to the development of the environmental impact statement: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to construct the Miami Harbor project, as recommended in the Miami Harbor Letter Report dated August 2002, as revised February 2003: Provided further, That using $500,000 of the funds appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, is authorized and directed to plan, design, and initiate reconstruction of the Cape Girardeau, Missouri, project, originally authorized by the Flood Control Act of 1950, at an estimated total cost of $9,000,000, with cost sharing on the same basis as cost sharing for the project as originally authorized, if the Secretary determines that the reconstruction is technically sound and environmentally acceptable: Provided further, That the planned reconstruction shall be based on the most cost-effective engineering solution and shall require

VerDate 11-MAY-2000

10:15 Aug 27, 2004

Jkt 019194

PO 00000

Frm 00782

Fmt 6580

Sfmt 6581

D:\STATUTES\2003\19194PT2.001

APPS10

PsN: 19194PT2