Page:United States Statutes at Large Volume 119.djvu/1277

This page needs to be proofread.

[119 STAT. 1259]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1259]

PUBLIC LAW 109–59—AUG. 10, 2005

119 STAT. 1259

Highway Projects High Priority Projects—Continued

No.

State 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Project Description

OH

Plan and construct the Southeast Arterial Connector highway at Delaware, Ohio .......... To construct transportation enhancements on a multi-faceted greenway in downtown Columbia on the Duck River .............................. New Interchange constructed from I–195 to Taunton and Warren Avenue in East Providence ................................................................. Town of Chester reconstruction of Walton Lake Estates subdivision and related roads Extend M.L. King, Jr., Boulevard in Monroe ... Town of Fishkill Old Glenham Road (aka Washington Ave.) reconstruction ................... U.S. Route 13 Corridor Reconstruction, Redevelopment and Beautification, Bucks County Rochester and Southern Highway-Rail Grade Crossing Bypass, Silver Springs, New York Upgrade streets in the City of Rushville, IL .... Construct 2 lanes on Chouteau Trafficway from MO 210 to I–35 ....................................... U.S. 60 to Gonzalez Pass .................................... Interstate lighting system (I–10 and LA 93) .... ............................................................................... SR 704 Cross-Base Highway, Spanaway Loop Road to SR 7 .................................................... Village of Brewster Main Street and Route 6 related construction and improvements ........ Design and construct relocation of U.S. 11 between Ridge Hill and Hempt Roads .............. Improve Route 42 (Main Street) in Bridgewater, Virginia ................................................. Construction of Route 59 Palisades Interstate Parkway to Route 303 ..................................... Improve University Drive, Macomb .................. Adams Street Rehabilitation Project, Glendale Construct grade separation-interchange between Taconic Parkway and Pudding Street Construction of 100th St. interchange on I–35/ I–80, Urbandale ............................................... Lewis and Clark Expressway ............................ Mercer County, PA I–79 and PA 208 Interchange Improvement Project .......................... Plan to relieve traffic until North-South freeway Hwy 2 ....................................................... San Diego River Multiuse Bicycle and Pedestrian Path ......................................................... Construction of the Lafayette Street extension project in Montgomery County, PA ............... Construct new ramps between I–295 and Route 42 ........................................................... Construct SR 29 Wal-mart to River Betterment, Eaton Tunkhannock, Wyoming County ....................................................................... Construct Shawnee Parkway ............................. Improve pedestrian and bicycle sidewalks, lighting, and ADA ramps—Main Street, Canal Street, Miramar .................................... Reconstruct CSAH 19 from CSAH 36 to CSAH 2, Morrison County .........................................

TN RI NY NC NY PA NY IL MO AZ LA WA NY PA VA NY IL CA NY IA MO PA WA CA PA NJ PA WV FL MN

Jkt 039194

PO 00002

Frm 00116

Fmt 6580

Sfmt 6581

Amount $4,480,000 $6,400,000 $4,640,000 $64,000 $1,600,000 $260,400 $4,000,000 $1,464,000 $800,000 $1,600,000 $3,040,000 $240,000 $0 $1,200,000 $780,000 $4,544,000 $400,000 $1,000,000 $400,000 $310,400 $1,160,000 $800,000 $1,600,000 $2,400,000 $440,000 $400,000 $9,120,000 $4,000,000 $1,360,000 $880,000 $480,000 $160,000

E:\PUBLAW\PUBL002.119

APPS06

PsN: PUBL002