Page:United States Statutes at Large Volume 119.djvu/1313

This page needs to be proofread.

[119 STAT. 1295]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1295]

PUBLIC LAW 109–59—AUG. 10, 2005

119 STAT. 1295

Highway Projects High Priority Projects—Continued

No. 992 993 994 995 996 997 998 999 1000 1001 1002 1003 1004 1005 1006 1007 1008 1009 1010 1011 1012 1013 1014 1015 1016 1017 1018 1019

VerDate 14-DEC-2004

13:51 Oct 26, 2006

State

Project Description

TX

Construct a pedestrian/bicycle trail in the Sunnyside area of Houston ................................... Construct remaining 800-foot 4-lane divided thoroughfare for Preston Rd. segment between Beltway 8 and Genoa Red Bluff Rd .... ............................................................................... Medical University of South Carolina Roadway Enhancement ................................................... Acquisition of adjacent property to planned Park-n-Ride at Kressler and Hamilton Boulevards in Wescosville, PA .............................. Livonia, reconstruct Stark Rd. between Plymouth Rd. and I–96 ........................................... PA Route 309 roadway construction and signalization improvements in Tamaqua Borough .................................................................. Union Square Roadway and Streetscape Improvements ....................................................... Improvements to South McColl Road in Hidalgo County .................................................... Widen U.S. Highway 61 and improve major intersections, Natchez ..................................... Widen U.S. 82 from 2-lane facility to 4-lane facility from FM 1417 in Sherman, TX to U.S. 69 in Bells, TX ................................................. Widen U.S. 79, from FM 1512 near Jewett to IH–45 to a 4-lane divided highway ................ Construct shoulder and turn lane on SR 35 in Seymour, Tennessee ........................................ Construction of Heartland Expressway between Alliance and Minatare, NE ................. Pedestrian Sidewalk Construction in Snohomish .................................................................. North Second Street Corridor Upgrade, Memphis ................................................................... Purchase High Speed Ferries for Black River Excursion Boat Service, Lorain ...................... MD4 at Suitland Parkway ................................. Widen U.S. 60 from approximately 2 miles east of the U.S. 60/US 75 interchange east approximately 5.5 miles .................................. Widen U.S. 401 from Wake County to Louisburg ......................................................... CUPSS, Pennsylvania, Urban Maglev Demonstration Test Project .................................... Widen U.S. 287 Bypass at Ennis from two to four lanes ......................................................... Widen U.S. 27 from KY 34 to U.S. 150 Bypass, Garrard County and Lincoln County ............. Right-of-way acquisition for Mississippi River Bridge connecting I–94 and U.S. 10 between U.S. 169 and TH 101 ...................................... Rehabilitate Highway 53 between Chippewa Falls and New Auburn .................................... Widen U.S. Route 67 from Macomb to Illinois 101 .................................................................... Widen U.S. Route 51 from Pana to Vandalia ... Widen U.S. Route 34 from U.S. 67 to Carmen Road ..................................................................

TX

SC PA MI PA MA TX MS TX TX TN NE WA TN OH MD OK NC PA TX KY MN WI IL IL IL

Jkt 039194

PO 00002

Frm 00152

Fmt 6580

Sfmt 6581

Amount $750,000 $928,000 $0 $3,200,000 $2,000,000 $800,000 $1,600,000 $400,000 $1,920,000 $3,040,000 $3,600,000 $1,600,000 $1,200,000 $6,000,000 $140,000 $1,600,000 $600,000 $3,200,000 $1,600,000 $2,400,000 $4,000,000 $6,400,000 $1,600,000 $800,000 $3,200,000 $1,600,000 $2,400,000 $3,200,000

E:\PUBLAW\PUBL002.119

APPS06

PsN: PUBL002