Page:United States Statutes at Large Volume 119.djvu/1446

This page needs to be proofread.

[119 STAT. 1428]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1428]

119 STAT. 1428

PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued

No. 4471 4472 4473 4474 4475 4476 4477 4478 4479 4480 4481 4482 4483 4484 4485 4486 4487 4488 4489 4490 4491 4492 4493 4494 4495 4496 4497 4498

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Jkt 039194

PO 00002

State

Project Description

ND

Reconstruction of U.S. 85 north of Grassy Butte to Long-X Bridge near Teddy Roosevelt National Park North Unit ................... ND 22 Reconstruction from 15th St. to North Corporate Limits in Dickinson ....................... ND 200 Reconstruction from Jct. ND 49 at Beulah to Hazen .............................................. North Bound I–29 Reconstruction from south of ND 15 to Near Grand Forks ...................... East Bound I–94 Reconstruction from Near South Heart to Dickinson ............................... ND 294/12th Avenue N Reconstruction and Bridge Widening in Fargo .............................. Replace Red River Valley Bridge at Drayton, ND .................................................................... U.S. 12 improvements between Bowman and Hettinger .......................................................... U.S. 83/North Broadway Reconstruction in Minot ................................................................ Mandan Avenue Reconstruction in Mandan .... ND 127 Reconstruction from ND 11 N. to Wahpeton ......................................................... U.S. 83 Reconstruction from Max to ND 23 SB U.S. 281 Reconstruction from Carrington to Jct. ND 15 ........................................................ Construction of the Columbus, Nebraska North Arterial Road ........................................ U.S. 34 Missouri River Bridge relocation and replacement ..................................................... Missouri River Bridges between U.S. 34, I–29 in Iowa and U.S. 75 in Nebraska ................... Design, right-of-way and construction of Nebraska Highway 35 between Norfolk to South Sioux City ............................................. Transportation improvements for U.S. 81 Meridian Bridge, Yankton ................................... Railroad Grade Separation Structures, Statewide .................................................................. Engineering, right-of-way and construction of the 23rd Street Viaduct in Fremont, Nebraska ............................................................... Design, right-of-way and construction of the Louisville bypass, Nebraska ........................... Construction of I–80/Cherry Avenue Interchange and East bypass, Kearney, Nebraska Interstate 80 Interchange at Pflug Road, Sarpy County, Nebraska ................................. Construction of Heartland Expressway between Alliance and Minatare, NE ................. New roads and overpass to relieve congestion and improve traffic flow for Antelope Valley—Lincoln, NE ............................................. Design of right-of-way and construction of South and West beltway in Lincoln, NE ....... Cuming Street Transportation improvement project in Omaha, NE ..................................... Nebraska Intelligent Transportation Systems Statewide .........................................................

ND ND ND ND ND ND ND ND ND ND ND ND NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE

Frm 00285

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

Amount

APPS06

$6,500,000 $2,000,000 $3,500,000 $8,000,000 $7,000,000 $11,000,000 $3,100,000 $10,000,000 $10,000,000 $2,000,000 $3,000,000 $6,000,000 $4,000,000 $1,400,000 $500,000 $1,200,000 $4,000,000 $1,800,000 $6,000,000 $700,000 $400,000 $1,000,000 $600,000 $8,000,000 $3,000,000 $2,000,000 $900,000 $1,000,000

PsN: PUBL002