Page:United States Statutes at Large Volume 119.djvu/1454

This page needs to be proofread.

[119 STAT. 1436]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1436]

119 STAT. 1436

PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued

No. 4689 4690 4691

4692 4693 4694 4695 4696 4697 4698 4699 4700 4701 4702 4703 4704 4705 4706

4707 4708 4709 4710 4711 4712 4713 4714 4715 4716 4717

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Jkt 039194

PO 00002

State

Project Description

OK

Reconstruct the I–44—Fort Sill Key Gate Interchange ...................................................... Realignment of U.S. 287 around Boise City ..... To study the feasibility of creating a by-pass around the City of Durant to accommodate the traffic needs of the International Trade Assistance Center ............................................ To construct a viaduct on U.S. Highway 70 over the railroad tracks in Durant ................ Enhancement projects for Woodward ................ Improvements to highways and bridges in the State of Oklahoma, divided equally among the eight field divisions ................................... For improvements to the State maintained interstate system in the State of Oklahoma Highway 20 Improvements from Pioneer Mountain to Eddyville, Lincoln County ........ For purchase of right-of-way, planning, design and construction of a highway, Newberg ...... Upgrade, to add a southbound lane to a section of I–5 through Portland, between Delta Park and Lombard, Portland ......................... Widening of Oregon Highway 217 between Tualatin Valley Highway and the U.S. 26 Interchange, Beaverton ................................... Improve Highway 22, Polk County ................... Improve I–5/99W Connecter, Washington County .............................................................. Improvements to U.S 97 from Modoc Point to Algoma ............................................................. Construct Barber Street Extension, Wilsonville For Interstate 5 interchange, City of Coburg ... Upgrade the I–5 Fern Valley Interchange at Exit 24, Medford .............................................. Construction of highway and pedestrian access to Macadam Ave. and street improvements as part of South Waterfront Development, Portland ........................................................... Plan, design, and acquire, Sunrise Corridor, Clackamas County .......................................... Relocate and improve Cascade Locks Southbank Enhancements, Cascade Locks ... Reroute U.S. 97 at Redmond, and improve intersection of U.S. 97 and Oregon 126 ......... Construction of I–84, U.S. 395 Stanfield Interchange Improvement Project .......................... Plan, design, and construct Frontage Road Crossing Project, Hood River .......................... Improve Marine Park Underpass to address necessary transportation improvements, Cascade Locks .................................................. Improve Barnhart Road, Umatilla County ....... P&W Rehabilitation Project, Yamhill County .. Transportation Improvements Around the Eugene, Oregon Federal Courthouse .................. Plan, design, and construct the Dalles, Oregon Riverfront Access ............................................. Troutdale Interchange enhancements at I–84 and 257th St, Troutdale ..................................

OK OK

OK OK OK OK OR OR OR OR OR OR OR OR OR OR OR

OR OR OR OR OR OR OR OR OR OR OR

Frm 00293

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

Amount

APPS06

$200,000 $200,000

$300,000 $6,400,000 $1,000,000 $53,150,000 $45,000,000 $5,000,000 $15,000,000 $7,000,000 $1,000,000 $1,700,000 $10,000,000 $3,500,000 $700,000 $1,000,000 $5,000,000

$2,000,000 $15,000,000 $1,000,000 $7,000,000 $3,400,000 $500,000 $400,000 $3,900,000 $700,000 $1,000,000 $1,800,000 $1,000,000

PsN: PUBL002