Page:United States Statutes at Large Volume 119.djvu/1457

This page needs to be proofread.

[119 STAT. 1439]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1439]

PUBLIC LAW 109–59—AUG. 10, 2005

119 STAT. 1439

Highway Projects High Priority Projects—Continued

No. 4772 4773 4774 4775 4776 4777 4778 4779 4780 4781 4782 4783 4784 4785 4786 4787 4788 4789 4790 4791 4792 4793 4794 4795 4796 4797 4798 4799

VerDate 14-DEC-2004

13:51 Oct 26, 2006

State

Project Description

PA

Design and Construction of Portzer Road Connector, Bucks County ...................................... Construction of pedestrian tunnel under Cherry Street in Philadelphia ................................ U.S. Route 13 Corridor Reconstruction, Redevelopment and Beautification, Bucks County Two-lane Extension of Bristol Road, Bucks County .............................................................. Relocation of PA 52 at Longwood Gardens, Chester County ................................................ Improvements to SR 39/I–81, West Hanover Township .......................................................... Construction of alternate truck route for SR 441, Columbia Borough .................................. Concord Road Extension, Springettsbury Township .......................................................... Widen PA 896 between Strasburg Borough and U.S. 30 ...................................................... Design and construct relocation of U.S. 11 between Ridge Hill and Hempt Roads .............. Construct and widen PA 94 from the Adams and York County line north to Appler Road Construct a turning lane off Route 16 in McConnellsburg, Fulton County .................... Improvements from U.S. 11 to southbound ramp to I–81 in Antrim Township ................. Construction of the Montour Trail, Great Allegheny Passage ................................................. Transportation Improvements for Armstrong County, PA Slatelick Interchange for PA 28 at SR 3017 ....................................................... Widening of Route 40 in Wharton Township, Fayette County ................................................ Completion of I–79-Kirwin Heights Interchange and construction of retaining walls, bridge and new ramps .................................... Construction of U.S. 22 to I–79 Section of Southern Beltway, Pittsburgh ........................ Reconstruct intersection of SR 51 and Franklin Ave, Beaver County ................................... South Phila. Access Rd. Design and construction of port access road from South Phila Port and intermodal facilities, Philadelphia Widen Route 22 between Export and Delmont Construct a new highway interchange between the PA Turnpike and I–95 and widen both routes to six lanes ........................................... Construct a highway connecting U.S. 119 near Uniontown with SR 88 near Brownsville ...... Construct a road along the North Delaware Riverfront Corridor from Buckius Street to Poquessing Creek ............................................ Construct an intermodal center at the Philadelphia Zoo ....................................................... Widen Route 412 corridor from I–78 into the City of Bethlehem ........................................... Improvements to the Erie Airport corridor ...... Widen I–81 from four to six lanes in the Wilkes-Barre/Scranton corridor .....................

PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA

Jkt 039194

PO 00002

Frm 00296

Fmt 6580

Sfmt 6581

Amount $1,600,000 $2,000,000 $1,000,000 $400,000 $200,000 $500,000 $1,000,000 $500,000 $500,000 $750,000 $300,000 $500,000 $250,000 $200,000 $500,000 $750,000 $400,000 $300,000 $400,000 $500,000 $260,000 $4,000,000 $4,000,000 $4,000,000 $2,000,000 $2,000,000 $1,000,000 $2,000,000

E:\PUBLAW\PUBL002.119

APPS06

PsN: PUBL002