Page:United States Statutes at Large Volume 119.djvu/1465

This page needs to be proofread.

[119 STAT. 1447]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1447]

PUBLIC LAW 109–59—AUG. 10, 2005

119 STAT. 1447

Highway Projects High Priority Projects—Continued

No. 4979 4980 4981 4982

4983 4984 4985 4986 4987 4988 4989 4990 4991 4992 4993 4994 4995 4996 4997 4998 4999 5000 5001 5002 5003 5004 5005 5006

VerDate 14-DEC-2004

13:51 Oct 26, 2006

State

Project Description

TN

Improve Streetscape and pavement repair, Scott County .................................................... Improve Streetscape and pavement repair, Morgan County ................................................ Improve Streetscape and pavement repair, Fentress County .............................................. Street improvements, streetscape features, signals and signage along 3rd Avenue North and Union Street in downtown Nashville, Tennessee ......................................................... Improvements to the Blount/Sevier Corridor in Knoxville, Tennessee to support the South Waterfront Redevelopment project ................ Replacement of the I–30 Bridge over the Trinity River in Dallas ........................................... Replacement of the Galveston Causeway Railroad Bridge in Galveston ................................ Construction of a new international rail bridge and rail track west of Brownsville ................. Construction of a three mile bypass around central San Marcos ......................................... Construction of a railroad grade separation at Calton Rd. in Laredo, TX (part of the West Laredo Multimodal Trade Corridor) .............. Transportation Improvements for the San Angelo Ports to Plains Route 306 at FM 388 .... Reconstruct Mile 6 West from U.S. 83 to SH 107 Hidalgo County ........................................ Tyler Outer Loop 49 Construction ..................... Transportation Improvements to Cotton Flat Road Overpass @ Interstate 20 ...................... Construction of a parking facility at the University of the Incarnate Word, San Antonio, Texas ................................................................ Research and construction, Southwest Center for Transportation Research and Testing, Pecos, TX .......................................................... Construct a reliever route on U.S. 287 south of Dumas to U.S. 287 north of Dumas ............... Widen FM 60 (University Drive) from SH 6 to FM 158, College Station ................................. Complete U.S. 77 relief route around City of Robstown .......................................................... North Rail Relocation Harlingen ....................... Improvements to KellyUSA 36th Street ........... Beaumont, TX Washington Blvd. Improvements ................................................................ Improvements to Cottonwood Trail ................... Improvements to FM 110 in San Marcos .......... Improvements to SH 71 from W of FM 20 to Loop 150 Bastrop County ............................... Construct 6 mainlines from east of Mercury to east of Wallsville ............................................. Geneva Rd-Provo Center Street, Orem 1600 North to I–15 FWY, Provo-widen from 2 to 4 lanes, Provo ...................................................... Construction of Midvalley Highway, Tooele County ..............................................................

TN TN TN

TN TX TX TX TX TX TX TX TX TX TX TX TX TX TX TX TX TX TX TX TX TX UT UT

Jkt 039194

PO 00002

Frm 00304

Fmt 6580

Sfmt 6581

Amount $500,000 $500,000 $500,000

$6,000,000 $6,000,000 $17,000,000 $15,000,000 $4,000,000 $10,000,000 $6,000,000 $5,000,000 $2,000,000 $3,000,000 $3,000,000 $2,000,000 $1,000,000 $3,000,000 $2,000,000 $4,000,000 $4,000,000 $2,000,000 $1,000,000 $1,000,000 $1,000,000 $2,000,000 $2,000,000 $2,000,000 $3,000,000

E:\PUBLAW\PUBL002.119

APPS06

PsN: PUBL002