Page:United States Statutes at Large Volume 119.djvu/670

This page needs to be proofread.

[119 STAT. 652]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 652]

119 STAT. 652

PUBLIC LAW 109–58—AUG. 8, 2005

(f) TERMINATION OF AUTHORITY.—Section 1212(f) of the Energy Policy Act of 1992 (42 U.S.C. 13317(f)) is amended by striking ‘‘the expiration of’’ and all that follows through ‘‘of this section’’ and inserting ‘‘September 30, 2026’’. (g) AUTHORIZATION OF APPROPRIATIONS.—Section 1212 of the Energy Policy Act of 1992 (42 U.S.C. 13317) is amended by striking subsection (g) and inserting the following: ‘‘(g) AUTHORIZATION OF APPROPRIATIONS.—There are authorized to be appropriated such sums as are necessary to carry out this section for each of fiscal years 2006 through 2026, to remain available until expended.’’. 42 USC 15852. President.

VerDate 14-DEC-2004

SEC. 203. FEDERAL PURCHASE REQUIREMENT.

(a) REQUIREMENT.—The President, acting through the Secretary, shall seek to ensure that, to the extent economically feasible and technically practicable, of the total amount of electric energy the Federal Government consumes during any fiscal year, the following amounts shall be renewable energy: (1) Not less than 3 percent in fiscal years 2007 through 2009. (2) Not less than 5 percent in fiscal years 2010 through 2012. (3) Not less than 7.5 percent in fiscal year 2013 and each fiscal year thereafter. (b) DEFINITIONS.—In this section: (1) BIOMASS.—The term ‘‘biomass’’ means any lignin waste material that is segregated from other waste materials and is determined to be nonhazardous by the Administrator of the Environmental Protection Agency and any solid, nonhazardous, cellulosic material that is derived from— (A) any of the following forest-related resources: mill residues, precommercial thinnings, slash, and brush, or nonmerchantable material; (B) solid wood waste materials, including waste pallets, crates, dunnage, manufacturing and construction wood wastes (other than pressure-treated, chemically-treated, or painted wood wastes), and landscape or right-of-way tree trimmings, but not including municipal solid waste (garbage), gas derived from the biodegradation of solid waste, or paper that is commonly recycled; (C) agriculture wastes, including orchard tree crops, vineyard, grain, legumes, sugar, and other crop by-products or residues, and livestock waste nutrients; or (D) a plant that is grown exclusively as a fuel for the production of electricity. (2) RENEWABLE ENERGY.—The term ‘‘renewable energy’’ means electric energy generated from solar, wind, biomass, landfill gas, ocean (including tidal, wave, current, and thermal), geothermal, municipal solid waste, or new hydroelectric generation capacity achieved from increased efficiency or additions of new capacity at an existing hydroelectric project. (c) CALCULATION.—For purposes of determining compliance with the requirement of this section, the amount of renewable energy shall be doubled if— (1) the renewable energy is produced and used on-site at a Federal facility;

08:19 Oct 26, 2006

Jkt 039194

PO 00001

Frm 00650

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL001.119

APPS06

PsN: PUBL001